My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-380
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2016 1:57:36 PM
Creation date
9/30/2015 9:26:47 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
11/15/2005
Control Number
2005-380
Agenda Item Number
11.I.1
Entity Name
Stanley Consultants, Inc.
Subject
Final Design and Plans Services
Area
CR 510 from CR 512 to east of 75th. Court
Supplemental fields
SmeadsoftID
5287
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
have facilities and right-of-ways along the project . Any additional work required by <br /> regulatory agencies pursuant to regulations established after the date of this Agreement <br /> shall be an additional service and the COUNTY shall compensate the ENGINEER in <br /> accordance with SECTION VI - Additional Work, of this Agreement and in accordance <br /> with the fee schedule in this Agreement, as approved by the COUNTY prior to <br /> commencement of any work performed. <br /> 7 . If following execution of this Agreement the COUNTY proposes to construct the <br /> improvements in a revised phased manner which requires the preparation of plans or the <br /> need to obtain or modify permits previously obtained, the ENGINEER will be <br /> compensated for this effort in accordance with the approved fee schedule in a <br /> subsequent work order to this Agreement. No such additional work shall be initiated <br /> unless approved by the Indian River County Board of County Commissioners. <br /> 8 . Compensation to the ENGINEER for basic services shall be in accordance with <br /> Section V — Compensation, of this Agreement, as mutually agreed upon by the <br /> ENGINEER and COUNTY . <br /> B . Design Survey <br /> The ENGINEER shall provide design survey services .iecessary to support and facilitate <br /> contemplated design and permitting activities associated with this project. This task will <br /> consist of the preparation of digital base map topographic surveys in accordance with the <br /> Professional Land Surveyors in Chapter 61G17-6, Florida Administrative Code , pursuant <br /> intent of the Florida Minimum Technical Standards set forth by the Florida Board of to <br /> Section 472 . 027 , Florida Statutes . Current topographical survey used in the PD&E Study of <br /> the project corridor will be field reviewed, updated and utilized in the Project . The survey <br /> will include : <br /> 1 . Survey update to account for the repaving and widening of CR 510 throughout the <br /> project limits in October 2005 where all existing asphalt surfaces were modified. A <br /> second survey may be required during the design to account for the widening of CR 510 <br /> from CR 512 to the high school . <br /> 2 . Survey the canal along the high school from CR 510 to the existing bridge at 92nd Court . <br /> Survey the bridge deck and superstructure . Include right of way survey and mapping for <br /> the project limits noted in Section 1 Project Limits and Description . <br /> 3 . Establishment of a project wide Horizontal Control Network within the PROJECT <br /> LIMITS . <br /> 4 . Establishment of a project wide Vertical Control Network within the PROJECT LIMITS . <br /> All elevations will be referenced to NGVD 1929 datum. <br /> 5 . Research and analysis of existing right of way information (to include Abstracts or Title <br /> Searches as provided by COUNTY) . Provide right-of-way maps , parcel sketches, legal <br /> descriptions and appraisal as directed by the COUNTY . <br /> 6 . Design survey will be performed at an hourly not-to-exceed cost basis . Any savings due <br /> to current certified surveys becoming available in the corridor shall be passed on to the <br /> COUNTY . <br /> Page 5 of 16 <br /> CR 510 Design Agreemem20051104.doc November 7, 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.