Laserfiche WebLink
`1 t/ <br /> i <br /> 4ob7 - 1 <br /> SECTION 00530 - EJCDC <br /> STANDARD FORM OF AGREEMENT <br /> BETWEEN OWNER AND CONTRACTOR <br /> ON THE BASIS OF A STIPULATED PRICE <br /> THIS AGREEMENT ("Agreement" or "Contract") , dated the 19-1k day of In the <br /> year 2007 by and between Indian River County, a political subdivision of h� Florida <br /> (hereinafter called OWNER) and Timothy Rose Contracting , Inc. . (hereinafter called <br /> CONTRACTOR). <br /> OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth , <br /> agree as follows : <br /> ARTICLE 1 WORK <br /> CONTRACTOR as an independent contractor and not as an employee shall furnish and complete <br /> all of the necessary labor, material , and equipment to perform the work as specified or indicated in <br /> the Contract Documents. The work is generally described as follows: <br /> A. CONTRACTOR shall complete all work as specified or indicated in the Contract <br /> Documents. The work is generally described as follows which shall include, but is <br /> not necessarily limited to the following . <br /> Construction of approximately 450 LF of 6" PVC water main , 80 LF of 6" <br /> Directional Drill water main , 1 Fire Hydrant Assembly and 12 water services on <br /> 27"' Drive north of 4 " Street in Indian River County, FL. Construction consists of, <br /> but is not limited to , utilities exploration , coordination with any permitting <br /> agencies , trenching , dewatering , installation of pipe with fittings and all <br /> appurtenances, restrainers , soil compaction , disinfection , testing (includes <br /> providing temporary jumper or another approved method for filling , disinfection <br /> and flushing ), irrigation repair, private property replacement or repair, franchise <br /> utility repair and traffic control . PVC pipe shall be C-900 per Indian River County <br /> Utility Standards and Specifications. <br /> ARTICLE 2 ENGINEER <br /> The project has been designed by Gordon E. Sparks, P. E . , hereinafter called ENGINEER, and <br /> who is to act as OWNER'S representative, assume all duties and responsibilities and have the <br /> rights and authority assigned to ENGINEER in the Contract Documents in connection with <br /> completion of the work in accordance with the Contract Documents. <br /> ARTICLE 3 CONTRACT TIME <br /> 3. 1 The CONTRACTOR shall be substantially completed with the following timeframe <br /> 00530- 1 <br /> H\Projects\0649\Bidding Contract Specifications\Spec Template\2007\00530\Agreement between Owner Contractor Rev. <br /> 012507.doc <br />