My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-314
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-314
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2016 12:16:13 PM
Creation date
9/30/2015 11:18:02 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/18/2007
Control Number
2007-314
Agenda Item Number
7.V.
Entity Name
Timothy Rose Contracting,Inc.
Subject
27th. Drive North of 4th. Street Water Assessment Project
Area
27th Drive North of 4th St.
Supplemental fields
SmeadsoftID
6605
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(a) Within 15 calendar days from effective date of Notice to Proceed , Contractor <br /> shall complete the following tasks: <br /> 1 . Obtain all necessary permits . <br /> 2 . Receive approved shop drawings for all materials and equipment to be <br /> utilized in the job . <br /> 3 . Perform all photographic recording and documentation of conditions prior <br /> to construction . <br /> 4 . Locate all existing utilities in the area of work . <br /> 5 . Mobilize all labor, equipment, and materials . <br /> 6 . Deliver and store all equipment and materials to the job site . <br /> 7 . Notify all utilities and other affected parties prior to initiating construction . <br /> (b) From 16 calendar days to 45 calendar days from the effective date of Notice to <br /> Proceed , the CONTRACTOR shall complete the following tasks : <br /> 1 . Install all pipe and appurtenant items. <br /> 2 . Perform all testing . <br /> 3 . Restore all disturbed areas to their pre-construction condition . <br /> 4 . Correct all deficiencies noted by Engineer. <br /> Completion of all tasks outlined above (i .e . , Subparagraphs a) and b ) constitutes <br /> Substantial Completion . <br /> (b) From 46 calendar days to 60 calendar days from the effective date of Notice to <br /> Proceed , the CONTRACTOR shall complete the following tasks : <br /> 1 . Clean up project area . <br /> 2. Remove all equipment and material from project site . <br /> 3 . Perform contract closeout procedures. <br /> Completion of all tasks outlined above ( i .e . , Subparagraphs a , b, and c) constitute Final <br /> Completion . <br /> 3 .2 Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the <br /> essence of this Agreement and that OWNER will suffer financial loss if the work is not <br /> completed within the times specified in Paragraph 3 . 1 above , plus any extensions thereof <br /> allowed in accordance with Article 12 of the General Conditions. They also recognize the <br /> delays, expense and difficulties involved in proving in a legal proceeding the actual loss <br /> suffered by OWNER if the work is not completed on time. Accordingly, instead of <br /> requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages <br /> for delay (but not as a penalty) CONTRACTOR shall pay OWNER four-hundred and fifty <br /> dollars ($450.00) for each day that expires after the time specified in Paragraph 3 . 1 for <br /> Substantial Completion , if CONTRACTOR shall neglect, refuse or fail to complete the <br /> remaining work within the Contract Time or any proper extension thereof granted by <br /> OWNER, CONTRACTOR shall pay OWNER four-hundred and fifty dollars ($450.00 ) for <br /> each day that expires after the time specified in Paragraph 3. 1 for completion and <br /> readiness for final payment. <br /> 00530-2 <br /> HSProjectM06491Bidding Contract SpecifcationMSpec Template\2007\00530NAgreement between Owner Contractor Rev. <br /> 012507.doc <br />