My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-041
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2016 2:06:28 PM
Creation date
9/30/2015 10:33:56 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
02/06/2007
Control Number
2007-041
Agenda Item Number
11.J.1
Entity Name
TLC Diversified Inc. of Palmetto
Subject
Master In-Line Pump Station
Area
1600 9th St. SW (Oslo Road)
Project Number
UCP-2628
Bid Number
2007025
Supplemental fields
SmeadsoftID
6108
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00530 - EJCDC <br /> STANDARD FORM OF AGREEMENT <br /> BETWEEN OWNER AND CONTRACTOR <br /> ON THE BASIS OF A STIPULATED PRICE <br /> THIS AGREEMENT, dated the �)_A _day of in the year CLG 9 by and <br /> between Indian River County, a political subdivision of the State of Florida ( hereinafter called <br /> OWNER) and III r nJynrCIfIPd . Inc. of Palmetto Florida (hereinafter called CONTRACTOR) . <br /> OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth , <br /> agree as follows: <br /> ARTICLE 1 . WORK <br /> CONTRACTOR shall complete all work as specified or indicated in the Contract Documents . The <br /> work is generally described as follows: <br /> Furnish all labor and materials necessary to construct a master sewer in-line pump station <br /> including the following : soil preparation , site clearing and grading , paving , site landscaping , <br /> CBS building for air-conditioned electrical room and generator, including concrete <br /> foundation and floor, 350 kw generator, fuel storage tank with pad , modifications to the <br /> existing LS #89 wetwell and panels , aboveground pump station including pumps, piping , <br /> valves, control valves, electrical gear, instrumentation , flow meters, modifications to <br /> existing pump station piping , painting and architectural treatment and accessory items, as <br /> depicted in these documents. <br /> CONTRACTOR , as an independent contractor and not as an employee, shall furnish , for the sum <br /> amount of $1,5+04,733 .00, all of the necessary labor, material , and equipment to perform the work <br /> described above in accordance with the Contract Documents. <br /> ARTICLE 2. ENGINEER <br /> The project has been designed by Kimley-Horn and Associates , Inc. , hereinafter called <br /> ENGINEER, and who is to act as OWNER'S representative, assume all duties and responsibilities <br /> and have the rights and authority assigned to ENGINEER in the Contract Documents in <br /> connection with completion of the work in accordance with the Contract Documents. <br /> ARTICLE 3. CONTRACT TIME. <br /> 3. 1 The work will be completed in accordance with the following time frame. <br /> (a) Within JM calendar days from the effective date of Notice to Proceed , the <br /> CONTRACTOR shall complete the following tasks: <br /> 1 . Construct facility building and pump station . <br /> 044572007 <br /> 00530- 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.