My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-041
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2016 2:06:28 PM
Creation date
9/30/2015 10:33:56 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
02/06/2007
Control Number
2007-041
Agenda Item Number
11.J.1
Entity Name
TLC Diversified Inc. of Palmetto
Subject
Master In-Line Pump Station
Area
1600 9th St. SW (Oslo Road)
Project Number
UCP-2628
Bid Number
2007025
Supplemental fields
SmeadsoftID
6108
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 . Install all pipes, valves , and appurtenant items. <br /> 3. Perform all testing . <br /> 4. Provide a system to the OWNER which is of beneficial use and allows the <br /> OWNER to provide utility service to their customers with normal <br /> operations . <br /> Completion of all tasks outlined above (i .e . , Subparagraphs a) constitute Stibstantial <br /> Completion , <br /> (b) From 181 calendar days to 21a calendar days from the effective date of Notice <br /> to Proceed , the CONTRACTOR shall complete the following tasks: <br /> 1 . Clean up project area. <br /> 2 . Restore all disturbed areas to their pre-construction condition . <br /> 3 . Correct all deficiencies noted by Engineer. <br /> 4 . Remove all equipment and material from project site. <br /> 5 . Perform contract close-out procedures. <br /> Completion of all tasks outlined above (i . e. , Subparagraphs a and b ) constitute Final <br /> Completion . <br /> 3.2 Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the <br /> essence of this Agreement and that OWNER will suffer financial loss if the work is not <br /> completed within the times specified in Paragraph 3. 1 above, plus any extensions <br /> thereof allowed in accordance with Article 12 of the General Conditions. They also <br /> recognize the delays, expense and difficulties involved in proving in a legal proceeding <br /> the actual loss suffered by OWNER if the work is not completed on time. Accordingly, <br /> instead of requiring any such proof, OWNER and CONTRACTOR agree that as <br /> liquidated damages for delay (but not as a penalty) CONTRACTOR shall pay OWNER <br /> three hundred and fifty dollars ($350 .00) for each day that expires after the time <br /> specified in Paragraph 3. 1 for Substantial Completion, if CONTRACTOR shall neglect, <br /> refuse or fail to complete the remaining work within the Contract Time or any proper <br /> extension thereof granted by OWNER, CONTRACTOR shall pay OWNER three <br /> hundred and fifty dollars ($350. 00) for each day that expires after the time specified in <br /> Paragraph 3. 1 for completion and readiness for final payment. <br /> 3.3 In addition to the above-stated liquidated damages, the CONTRACTOR shall be <br /> responsible for reimbursing OWNER for all costs incurred by OWNER to third party <br /> consultants including , without limiting the generality of the foregoing , any <br /> ENGINEER in administering the construction of the Project beyond the Substantial <br /> Completion date as specified in the Contract or beyond an approved extension of <br /> time granted to CONTRACTOR , whichever date is later. <br /> ARTICLE 4. CONTRACT PRICE. <br /> 4. 1 OWNER shall pay CONTRACTOR for completion of the work in accordance with the <br /> Contract Documents in current funds in the amount of $1, M4,Z33 no. <br /> 044572007 <br /> 00530-2 <br />