2 . Receive approved shop drawings for all materials and equipment to be <br /> utilized in the job. <br /> 3 . Perform all photographic recording and documentation of conditions prior <br /> to construction . <br /> 4• Locate all existing utilities in the area of work. <br /> 5. Mobilize all labor, equipment, and materials. <br /> 6 . Deliver and store all equipment and materials to the job site . <br /> 7. Notify all utilities and other affected parties prior to initiating construction . <br /> (b) From 1.E calendar days to 0 calendar days from the effective date of Notice to <br /> Proceed , the CONTRACTOR shall complete the following tasks: <br /> 1 . Install all pipe and appurtenant items . <br /> 2. Perform all testing . <br /> 3. Restore all disturbed areas to their pre-construction condition . <br /> 4. Correct all deficiencies noted by Engineer. <br /> Completion of all tasks outlined above (i. e . , Subparagraphs a and b) constitutes <br /> Substantial Completion . <br /> (b) From 1a1 calendar days to Z5 calendar days from the effective date of Notice to <br /> Proceed , the CONTRACTOR shall complete the following tasks; <br /> 1 . Clean up project area . <br /> 2. Remove all equipment and material from project site. <br /> 3. Perform contract Closeout procedures. <br /> Completion of all tasks outlined above (i . e. , Subparagraphs a, b , and c) constitute Final <br /> Completion . <br /> 3 .2 Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the <br /> essence of this Agreement and that OWNER will suffer financial loss if the work is not <br /> completed within the times specified in Paragraph 3. 1 above, plus any extensions thereof <br /> allowed in accordance with Article 12 of the General Conditions. They also recognize the <br /> delays, expense and difficulties involved in proving in a legal proceeding the actual loss <br /> suffered by OWNER if the work is not completed on time. Accordingly, instead of <br /> requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages <br /> for delay (but not as a penalty) CONTRACTOR shall pay OWNER four-hundred and fifty <br /> dollars ($450. 00) for each day that expires after the time specified in Paragraph 3. 1 for <br /> Substantial Completion , if CONTRACTOR shall neglect, refuse or fail to complete the <br /> remaining work within the Contract Time or any proper extension thereof granted by <br /> OWNER. In addition, CONTRACTOR shall pay OWNER fourwhundred and fifty dollars <br /> ($450 . 00) for each day that expires after the time specified in Paragraph 3. 9 for <br /> completion and readiness for final payment <br /> ARTICLE 4. CONTRACT PRICE. <br /> 4. 1 OWNER shall pay CONTRACTOR for completion of the Work in accordance with the <br /> Contract Documents in current funds 1n the amount of $27J o ao <br /> 00530 w2 <br /> F.Whrltie5kUTILMY - ENGINEERINGVI'n cls - Assessment ProlectsVaLOCK VILLA WATER PETITION WATER SERVICEeID <br /> 11AN 1\AGAITCIAAA'."AA C 1/ M pG1ACL'rA I., � Awwww o � � Act A .�..,....n..A Mhr.rw. I1.�I 1AII p.v./r.,^IN /IM <br />