My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-343
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-343
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2016 9:54:31 AM
Creation date
10/1/2015 12:46:31 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
10/21/2008
Control Number
2008-343
Agenda Item Number
8.N.
Entity Name
Carter Associates
Subject
Amendment No.9 Services on 66th Ave. Paving Improvements
Area
66th Ave. SR 60 and 4th St. 16th St/College Lane Intersection
Project Number
9810
Supplemental fields
SmeadsoftID
7661
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> • The intersection design shall accommodate the four lanes currently being constructed on the east <br /> approach for College Lane , the three lanes proposed on the west approach for 16"' street, and the <br /> ultimate five lanes on the north and south approaches for 66th Avenue . <br /> • Revise 66th Avenue Phase 1 Summary of Quantities , Plan and Profile sheets, Cross Sections , and <br /> Signing & Pavement Marking sheets . <br /> • Submit plans for review/comment/approval by the IRC Traffic engineering department and <br /> revise/update plans as required. <br /> • Provide mast arm foundation design by a structural engineering sub-consultant. <br /> • Provide construction administration services for the traffic signal installation concurrent with the <br /> roadway construction of the Phase 1 portion of the project. These services will be provided on a <br /> time & materials basis utilizing the budget amount stipulated in Amendment No . 3 . <br /> Utility Coordination : <br /> The Engineer shall prepare "marked-up" plans showing known existing utilities along 66th Ave and shall <br /> attend a utility coordination meeting arranged by the County . These services are needed in order to renew <br /> coordination with the utility owners as previous base contract utility coordination efforts were conducted <br /> several years ago . <br /> ROW Acquisition Agreements : <br /> In general, the project plans will be modified to accommodate several specific requirements of ROW <br /> acquisition agreements , as follows : <br /> • Revise 66th Avenue Phase 2 Summary of Quantities, Plan and Profile and Cross Section sheets, and <br /> create fencing details to add a 4-board horse fence along the Graves property frontage on 66th Ave . <br /> • Revise 66th Avenue Phase 2 Summary of Quantities and Plan and Profile sheets, to add a culvert <br /> replacement at the Knight property on 4th Street. <br /> • Revise 66th Avenue Phase 2 Summary of Quantities, Summary of Drainage Structures, and Plan and <br /> Profile sheets, to add a drainage swale and inlets at the Hefflebower property on 8th Street. <br /> • Revise 66th Avenue Phase 2 Summary of Quantities and Plan and Profile sheets, to add a culvert <br /> replacement at the Schacht property on 8th Street. <br /> Plan Revisions for Post400 % Comments : <br /> In general, the project plans will be modified to address post- 100% comments, as follows : <br /> • Update the General Notes with current utility company contacts and current FDOT references . <br /> • Import new topographic survey data of existing facilities on 4`h, 8th, and 12th Streets . <br /> • Revise Summary of Quantities to add a bid item for removal of existing wells . <br /> • Revise Phase 1 Plan and Profile sheets to show a recently installed 25 -pair AT&T buried cable . <br /> • Revise water main design on Plan and Profile sheets to accommodate the proposed sidewalk <br /> installation north of the Phase 1 project limits to SR-60 . <br /> • Revise IRFWCD permit application submittal to include the proposed construction along Lateral <br /> Canal "A" north of the phase 1 project limits to SR-60 . <br /> • Re-evaluate the proposed stormwater drainage system design on the north side of 4th Street, east of <br /> 66th Avenue . <br /> • Re-evaluate the proposed stormwater drainage system design on the north side of 8th Street, east of <br /> 66th Avenue . <br /> • Revise 66th Avenue Phase 2 Summary of Quantities , Summary of Drainage Structures , and Plan and <br /> Profile sheets, to substitute a ditch bottom inlet in lieu of drainage structure ME4 at the north-east <br /> corner of the 4th Lane intersection . <br /> • Re-evaluate the proposed side-street profiles at 656' Ave . , 4th Place, 4th Lane , 50' Street, and 5th Place , <br /> Serving Florida <br /> N: \PSW\98-23E\Agreements\Amendment 9 proposal(revised).doc X I IA Since 1911 <br />
The URL can be used to link to this page
Your browser does not support the video tag.