4 <br />• The intersection design shall accommodate the four lanes currently being constructed on the east <br />approach for College Lane, the three lanes proposed on the west approach for 16"' street, and the <br />ultimate five lanes on the north and south approaches for 66th Avenue. <br />• Revise 66th Avenue Phase 1 Summary of Quantities, Plan and Profile sheets, Cross Sections, and <br />Signing & Pavement Marking sheets. <br />• Submit plans for review/comment/approval by the IRC Traffic engineering department and <br />revise/update plans as required. <br />• Provide mast arm foundation design by a structural engineering sub -consultant. <br />• Provide construction administration services for the traffic signal installation concurrent with the <br />roadway construction of the Phase 1 portion of the project. These services will be provided on a <br />time & materials basis utilizing the budget amount stipulated in Amendment No. 3. <br />Utility Coordination: <br />The Engineer shall prepare "marked -up" plans showing known existing utilities along 66th Ave and shall <br />attend a utility coordination meeting arranged by the County. These services are needed in order to renew <br />coordination with the utility owners as previous base contract utility coordination efforts were conducted <br />several years ago. <br />ROW Acquisition Agreements: <br />In general, the project plans will be modified to accommodate several specific requirements of ROW <br />acquisition agreements, as follows: <br />• Revise 66th Avenue Phase 2 Summary of Quantities, Plan and Profile and Cross Section sheets, and <br />create fencing details to add a 4 -board horse fence along the Graves property frontage on 66th Ave. <br />• Revise 66th Avenue Phase 2 Summary of Quantities and Plan and Profile sheets, to add a culvert <br />replacement at the Knight property on 4th Street. <br />• Revise 66th Avenue Phase 2 Summary of Quantities, Summary of Drainage Structures, and Plan and <br />Profile sheets, to add a drainage swale and inlets at the Hefflebower property on 8th Street. <br />• Revise 66th Avenue Phase 2 Summary of Quantities and Plan and Profile sheets, to add a culvert <br />replacement at the Schacht property on 8th Street. <br />Plan Revisions for Post400% Comments: <br />In general, the project plans will be modified to address post -100% comments, as follows: <br />• Update the General Notes with current utility company contacts and current FDOT references. <br />• Import new topographic survey data of existing facilities on 4`h, 8th, and 12th Streets. <br />• Revise Summary of Quantities to add a bid item for removal of existing wells. <br />• Revise Phase 1 Plan and Profile sheets to show a recently installed 25 -pair AT&T buried cable. <br />• Revise water main design on Plan and Profile sheets to accommodate the proposed sidewalk <br />installation north of the Phase 1 project limits to SR -60. <br />• Revise IRFWCD permit application submittal to include the proposed construction along Lateral <br />Canal "A" north of the phase 1 project limits to SR -60. <br />• Re-evaluate the proposed stormwater drainage system design on the north side of 4th Street, east of <br />66th Avenue. <br />• Re-evaluate the proposed stormwater drainage system design on the north side of 8th Street, east of <br />66th Avenue. <br />• Revise 66th Avenue Phase 2 Summary of Quantities, Summary of Drainage Structures, and Plan and <br />Profile sheets, to substitute a ditch bottom inlet in lieu of drainage structure ME4 at the north-east <br />corner of the 4th Lane intersection. <br />• Re-evaluate the proposed side -street profiles at 656' Ave., 4th Place, 4th Lane, 5t'' Street, and 5th Place, <br />N:\PSW\98-23E\Agreements\Amendment 9 proposal(revised).doc <br />Serving Florida <br />Since 1911 <br />