My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-343
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-343
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2026 1:27:28 PM
Creation date
10/1/2015 12:46:31 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
10/21/2008
Control Number
2008-343
Agenda Item Number
8.N.
Entity Name
Carter Associates
Subject
Amendment No.9 Services on 66th Ave. Paving Improvements
Area
66th Ave. SR 60 and 4th St. 16th St/College Lane Intersection
Project Number
9810
Supplemental fields
SmeadsoftID
7661
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Assumptions: <br />In developing this proposal, the following assumptions have been made and deviation from these <br />assumptions may require additional expenditures on behalf of the County to the Engineer. <br />• The County will provide any additional survey data that may be needed. <br />• The County will provide geotechnical engineering services to conduct borings at each mast arm <br />foundation location. The Engineer will coordinate the locations and extent of the sub -surface <br />explorations with the geotechnical engineering firm. <br />• No traffic study or timing analysis will be required. The IRC Traffic Engineering Department shall <br />provide the traffic signal phasing and timing desired for the proposed traffic signal. <br />Compensation* <br />Amendment No. 9 fees will be invoiced on a percent complete lump sum basis. The total amount to be billed <br />shall not exceed $41,080.00 unless authorized by an additional written agreement, as follows: <br />Plan Revisions for Sidewalk $2110.00 <br />Plan Revisions for Tie-in at College Lane.."",,,,"., " & <br />MastArm Signal:......................................................................064$1,120.00 <br />TRCWFoundadon Design ..................l4,000.00 <br />CAI Signal Design ....... <br />....................................................................... $14 890.00 <br />Utility Coordination...$1, 670.00 <br />................................................................... <br />Plan Revisions for ROW Acquisition Agreements'"'1111 <br />.....................................................................11 111S.5,480a00 <br />Post -100% Comments00. <br />Reimbursable Expenses................................................................................................................ $11,210.00 <br />....................................TOTAL PROFS .............. 600.00 <br />............................. <br />SSIONAL SERVICES = $41,080.00 <br />Time for Completion: <br />The Engineer shall complete the plan revisions and preliminary signalization design within 90 days of receipt <br />of a written Notice to Proceed. The Engineer shall complete the final signalization design within 30 days <br />after receipt of review comments from the County Traffic Engineer. <br />Duration of Agreement: <br />The duration of the Agreement shall be extended to remain in full force and effect for a period of three years <br />after the date of execution of this Amendment. <br />Please call on me should you have any further questions or concerns regarding our proposed scope of work <br />or terms of agreement. <br />Sincerely, <br />Patrick S. Walther, P.E. <br />Project Principal <br />Attachments We Exhibit "A" (man-hour fee estimate) <br />Serwv Florida <br />N:\PSW\P\98-23E\Agreements\Amendment 9 proposal(revised).doc % �IN <br />`I, Since 191111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.