My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-343
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-343
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2016 9:54:31 AM
Creation date
10/1/2015 12:46:31 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
10/21/2008
Control Number
2008-343
Agenda Item Number
8.N.
Entity Name
Carter Associates
Subject
Amendment No.9 Services on 66th Ave. Paving Improvements
Area
66th Ave. SR 60 and 4th St. 16th St/College Lane Intersection
Project Number
9810
Supplemental fields
SmeadsoftID
7661
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County <br /> 66th Avenue Roadway Improvements Exhibit "A " <br /> IRC Project No, 9810 <br /> Addendum No. 9 <br /> Fee Estimate (rate schedule as per CAI continuing services agreement with IRC) <br /> 10/10/2008 <br /> $ 140.00 $ 125.00 $ 110.00 $75.00 540.00 <br /> Eng. t,Priu . En ,. t, P.E. En •. 11, P.E. CADD Tccb Clerical Subtotal <br /> Patrick Steve Sean Domenic Trisha/Frank <br /> Re-insert sidewalk factual time billed) 1 2 2 20 2, 110.00 <br /> snb-total = 2 ! ! O.UO <br /> Re-draft tie-in at College Lane 2 12 15120.00 <br /> Add mast-arm traffic signal <br /> sub-total = 1 , 120.00 <br /> TRCW foundation -design <br /> 4.000.00 <br /> Traffic signal plans, key sheet, notes, quantities and details S 32 52 8,540.00 <br /> Signing & Markin plan revisions 8 12 1 ,780.00 <br /> Plan/Profile revisions 4 8 1 .040.00 <br /> Adjust quantities <br /> 6 450.00 <br /> Coordmation/Meethtgs/incidentals 4 16 8 4 3A80.00 <br /> sub-total = 18.890.00 <br /> Utility Coordination Meeting 4 6 6 1 .670.00 <br /> sub-total = 1 ,670.00 <br /> ROW Acquisition A reements <br /> Add Graves horse fence (66th Ave STA24+00) 3 I2 1 .230.00 <br /> Add Knight culvertr lacement (4th Street STA23+23) 1 3 335.00 <br /> Add Hefflebower Swale and inlets 8th Street STA17+30 and STA 20+55 I 2 4 660 00 <br /> Add Schacht culvert replacement 8th Street STA21 +80) I 3 335.00 <br /> Coordmation/Meetings/Incidentals 6 12 8 4 2,920.00 <br /> sub-total = 51480.00 <br /> Plan &evisions Post-100% Submittal <br /> Update phone numbers and MOT references 150.00 <br /> I <br /> mport survey data ] 2 900.00 <br /> m for "remove well" 2 150.00 <br /> 25 PR cable as shown on Arcadis plans 2 150.00 <br /> tetmain and fire hydrants for sidewalk in ATcadis Portion of the project 6 450.00 <br /> CD 't a lication to include Arcadis ortion of the ro'ect 2 220.00 <br /> drain on 4th Street east of 66th Ave 6 12 12 3,060.00 <br /> drains a on 8th Street east of 66th Ave 6 12 12 3.060.00 <br /> Substitute inlet for ME-4 66th Ave STA15+73) 1 3 335.00 <br /> Revise side street profiles 2 7 ] 8 2.400.00 <br /> sub-total = 11 .210.001 <br /> Reimbursable Expenses <br /> 600.00 <br /> sub-total = 600 .00 <br /> GRAND TOTAL = $41,080.00 <br /> J JF SeMngFlorida <br /> Since 1911 <br />
The URL can be used to link to this page
Your browser does not support the video tag.