My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-110
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2016 2:24:07 PM
Creation date
9/30/2015 8:35:59 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
First Amendment
Approved Date
03/29/2005
Control Number
2005-110
Agenda Item Number
11.J.2
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Northwest Regional Wastewater Pump Station Amendment No.1 to Work Order
Supplemental fields
SmeadsoftID
4847
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IY <br /> Shop drawing submittals will be reviewed for conformance with the contract documents , hop drawings <br /> will be submitted directly to Engineer. Consultant will review the submittals and return copies to the <br /> contractor and Indian River County Utilities . <br /> Consultant will provide coordination of project status meetings and observation of construction for the <br /> duration of the project . Consultant will also review pay requests and provide recommenda ions for <br /> payment to Indian River County Utilities for the progress of the work. <br /> Construction observation will be provided by a field inspector . Total observation time will be <br /> approximately 100 hours . The field inspector will observe construction in order to determine if the <br /> project is being constructed in accordance with the contract documents . Work that Consultant believes <br /> does not comply with the contract documents will be brought to the attention of Indian RiN er County <br /> Utilities and the contractor. <br /> Start-up of the new pumps will be facilitated by the pump manufacture ' s representative and by the <br /> Contractor. Consultant will observe start-up of the new pumps once the installation is completed . <br /> All other construction phase observations as stipulated in the original work order #2 will be included. <br /> FEES : <br /> Consultant will provide these Services as described herein on a lump sum basis for the foll wing fees : <br /> Task Fee $ <br /> 1 . Survey $ 400 <br /> 2 . Design $ 5 ,400 <br /> 3 . Construction Phase Services $ 3 ,400 <br /> Total $ 13 ,400 <br /> H :\044572006\Scope, fees , and job start\64th & CR 510 Master Pump Station Proposal-Amendment Ldoc <br />
The URL can be used to link to this page
Your browser does not support the video tag.