Attachment 1 <br /> To <br /> Amendment 1 <br /> To <br /> Work Order Number 2 <br /> Proiect Description and Understanding <br /> This Amendment Number 1 modifies the scope of work in Work Order #2 for the survey, design , and <br /> construction tasks of the new Northwest Regional wastewater pump station . The original scope included <br /> the design of a conventional pump station which included a wetwell , submersible pumps , and odor <br /> control system. Through discussions with staff, there is a desire to construct an in-line pump station with <br /> building in lieu of a conventional pump station in order to eliminate odors and reduce maintenance <br /> typically associated with conventional pump stations . Therefore , the following amendment includes <br /> scope modifications to provide additional survey for an alternate site , design for a building to house the <br /> pumps , piping, electrical , generator, and electrical room, and provide construction phase services for the <br /> building and structure . <br /> SCOPE OF SERVICES <br /> The following tasks are included : <br /> Task 1 — Survey <br /> KHA will provide survey for an alternate site located adjacent to the playground on the Northwest corner <br /> of the school on the County common area . The site survey will include a boundary survey , topo , and <br /> other above ground information in that area . Additional survey for an alternate route fort e forcemains <br /> to the west of the site will also be included . <br /> Task 2 - Design <br /> The design of a CBS structure to house the pumps , piping, generator, electrical , and controls will be <br /> included . The approximate size will be 500 sq ft footprint with architectural treatments, ar d include an <br /> access road (shellrock equivalent) to the facility from 64tb Ave . <br /> All other design requirements as stipulated in the original work order #2 will be included . <br /> Task 3 —Construction Phase Services <br /> Consultant will provide additional construction phase services for the construction of the b jilding, <br /> including bidding and contract administration, shop drawing review, coordination and mee Ling <br /> attendance, construction observation , start-up services , preparation of record drawings , inc uding <br /> electronic format in AutoCadd R14 version in real world coordinates on CD, mylars, and f nal <br /> certification of completion of the project. It is anticipated that the duration of construction phase (notice <br /> to proceed to final completion) will be five to six (5 -6) months and that on-site construction observations <br /> will be as appropriate with the level of construction activity. <br /> Consultant will answer contractor questions and prepare addendums, as needed which will be distributed <br /> to all the contract document holders . Consultant will attend a pre-bid meeting at the project site or main <br /> office . Consultant will sell project manuals from our office , including drawings, specifications , and <br /> generation of all addendums . <br /> H :\044572006\Scope, fees, and job start\64th & CR 510 Master Pump Station Proposal-Amendment Ldoc <br />