Laserfiche WebLink
✓JD6 � U �jS" <br /> Amendment ] <br /> To <br /> Work Order Number 4 <br /> Project Description and Understanding <br /> This Amendment Number 1 modifies the scope of work in Work Order #4 for additional survey, design, <br /> permitting and construction phase services for the Wabasso River HDD crossing. The Florida DOT plans <br /> on constructing sidewalk along the entire causeway (four bridges total), which will require removal of the <br /> existing watermain, forcemain, and concentrate pipes currently being supported from all four bridges . <br /> This scope amendment includes pipe replacement of the two other shorter span bridges which were not <br /> included in the original scope. The short span bridges are located just west of Marsh Island development <br /> and west of the western long bridge. The following scope includes additional survey, pot-holing for <br /> existing utilities , and modifications to the existing permits which have already been issued . The project <br /> has been advertised but put on hold in reaction to recent cost fluctuations in HDPE pipe due to the <br /> volatility in the petroleum market. Re-advertisement of the project is included in this scope amendment . <br /> The scope of work for the 24" reuse main includes the full extents of the Wabasso bridges from the <br /> mainland to the barrier island. A demolition plan will also be prepared for removal of the existing aerial <br /> watermain and forcemain on the existing bridges . <br /> The existing 12" brine line will be taken out of service and used as a reuse line . Included in this <br /> amendment is a tie-in to the existing 12" brine line on the Western side of the Western short bridge. <br /> Limited right-of-way is available in this area . Due to limited space on the south area of the CR-510, the <br /> reuse line will exit on the North side of the Western-most bridge . An open-cut, jack-and -bore, or research <br /> into available right-of-way will be investigated to confine the tie-in within a 200 ft area west of the <br /> Western bridge . <br /> SCOPE OF SERVICES <br /> The following amended tasks are included: <br /> Task 1 — Survey <br /> KHA will provide survey for two additional bridges along CR 510 causeway. The site survey will <br /> include, topo, and other above ground information in that area . Survey the planned drilling and landing <br /> sites for horizontal and vertical locations of existing features, including the implementation of available <br /> record drawing data . Survey of pot-holed information of existing underground utilities will be provided <br /> using vacuum excavation soft-surface locations with a test hole report for each location . <br /> It is assumed that the geotechnical information collected to date is sufficient information for the extents of <br /> this project. Additional soil borings are not included under this scope. <br /> Pot-holing information will be provided by Ground Hound Detection Services to identify as-built <br /> information of existing utilities . Approximately 70 holes using vacuum excavation soft-surface locations <br /> with a test hole report for each location will be provided. <br /> Task 2 — Design <br /> Consultant will prepare and provide design drawings of the proposed profile. Consultant will prepare <br /> design details of the proposed tie-in details to the existing watermain, forcemain, and proposed reuse <br /> main. Consultant will prepare technical specifications for the proposed piping and construction . It is <br /> P:\Utilities\UTILITY - EMPLOYEE POLDERS\Larry Brown\Wabasso HDD Proposal-Amendment I reO doc <br />