My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-095
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-095
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2016 3:35:28 PM
Creation date
9/30/2015 9:35:46 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
03/21/2006
Control Number
2006-095
Agenda Item Number
11.J.2.
Entity Name
Kimley-Horn and Associates
Subject
Amendment 1 to Work Order No.4 for for additional survey, and design
Area
Wabasso River HDD crossing
Supplemental fields
SmeadsoftID
5534
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
✓JD6 � U �jS" <br /> Amendment ] <br /> To <br /> Work Order Number 4 <br /> Project Description and Understanding <br /> This Amendment Number 1 modifies the scope of work in Work Order #4 for additional survey, design, <br /> permitting and construction phase services for the Wabasso River HDD crossing. The Florida DOT plans <br /> on constructing sidewalk along the entire causeway (four bridges total), which will require removal of the <br /> existing watermain, forcemain, and concentrate pipes currently being supported from all four bridges . <br /> This scope amendment includes pipe replacement of the two other shorter span bridges which were not <br /> included in the original scope. The short span bridges are located just west of Marsh Island development <br /> and west of the western long bridge. The following scope includes additional survey, pot-holing for <br /> existing utilities , and modifications to the existing permits which have already been issued . The project <br /> has been advertised but put on hold in reaction to recent cost fluctuations in HDPE pipe due to the <br /> volatility in the petroleum market. Re-advertisement of the project is included in this scope amendment . <br /> The scope of work for the 24" reuse main includes the full extents of the Wabasso bridges from the <br /> mainland to the barrier island. A demolition plan will also be prepared for removal of the existing aerial <br /> watermain and forcemain on the existing bridges . <br /> The existing 12" brine line will be taken out of service and used as a reuse line . Included in this <br /> amendment is a tie-in to the existing 12" brine line on the Western side of the Western short bridge. <br /> Limited right-of-way is available in this area . Due to limited space on the south area of the CR-510, the <br /> reuse line will exit on the North side of the Western-most bridge . An open-cut, jack-and -bore, or research <br /> into available right-of-way will be investigated to confine the tie-in within a 200 ft area west of the <br /> Western bridge . <br /> SCOPE OF SERVICES <br /> The following amended tasks are included: <br /> Task 1 — Survey <br /> KHA will provide survey for two additional bridges along CR 510 causeway. The site survey will <br /> include, topo, and other above ground information in that area . Survey the planned drilling and landing <br /> sites for horizontal and vertical locations of existing features, including the implementation of available <br /> record drawing data . Survey of pot-holed information of existing underground utilities will be provided <br /> using vacuum excavation soft-surface locations with a test hole report for each location . <br /> It is assumed that the geotechnical information collected to date is sufficient information for the extents of <br /> this project. Additional soil borings are not included under this scope. <br /> Pot-holing information will be provided by Ground Hound Detection Services to identify as-built <br /> information of existing utilities . Approximately 70 holes using vacuum excavation soft-surface locations <br /> with a test hole report for each location will be provided. <br /> Task 2 — Design <br /> Consultant will prepare and provide design drawings of the proposed profile. Consultant will prepare <br /> design details of the proposed tie-in details to the existing watermain, forcemain, and proposed reuse <br /> main. Consultant will prepare technical specifications for the proposed piping and construction . It is <br /> P:\Utilities\UTILITY - EMPLOYEE POLDERS\Larry Brown\Wabasso HDD Proposal-Amendment I reO doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.