My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-095
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-095
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2016 3:35:28 PM
Creation date
9/30/2015 9:35:46 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
03/21/2006
Control Number
2006-095
Agenda Item Number
11.J.2.
Entity Name
Kimley-Horn and Associates
Subject
Amendment 1 to Work Order No.4 for for additional survey, and design
Area
Wabasso River HDD crossing
Supplemental fields
SmeadsoftID
5534
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l assumed that four (4) additional drawings will be prepared . <br /> Deletion of the line-stops on the drawings will be included in areas where they are not warranted. <br /> A demolition plan, including drawings of each bridge (4 total) , details including photos, and description <br /> of demolition work will be included for the existing watermain and forcemain currently being supported <br /> on the four (4) bridges . The existing 16" irrigation line owned by others will not be included under this <br /> scope . <br /> Task 3 — COE/ERP Permitting <br /> The existing ERP FDEP joint permit will need to be modified . Consultant assumes that only a permit <br /> letter modification will be necessary. Additional permit application fees not in excess of $500 will be <br /> covered . <br /> Task 4 — FDEP Permitting <br /> The FDEP general permit application has not been submitted yet but will include the 2 additional bridge <br /> sites, including application fees. Each bridge requires individual separate permits per FDEP since they <br /> are not contiguous . <br /> Task 5 — Construction Phase Services <br /> Re-advertisement of the project will be included . Consultant will answer bidding contractor questions <br /> and prepare addenda, as needed which will be distributed to all the contract document holders. <br /> Consultant will attend another pre-bid meeting at the project site or IRCUS ' main office . Consultant will <br /> sell project manuals from our office, including drawings, specifications, and generation of all addendums. <br /> Consultant will review bids and prepare a recommendation of award . <br /> Oversight of demolition of existing pipes will be by IRCU staff. It is assumed that a contractor different <br /> than the HDD contractor will be procured separately by fRCU staff. <br /> FEES <br /> Consultant will provide these Services as described herein on a lump sum basis as follows: <br /> Task Original Amount Revised Amount Change <br /> Task 1 — Survey $24,000 $46,500 $22 ,500 <br /> Task 2 — Design w/ demo plan $22, 800 $359200 $ 12,400 <br /> Task 3 — COE Permitting $ 193800 $24,200 $4,400 <br /> Task 4 — FDEP Permitting $7 ,550 $ 10 ,950 $3 ,400 <br /> Task 5 — Construction/Bidding $63 ,230 $ 742030 $ 10 , 800 <br /> Total WO#4 w/Adm. 1 $2153000 $268,500 $535500 <br /> CLOSURE <br /> Consultant will provide these services in accordance with our non-exclusive professional Consulting <br /> agreement dated April 6, 2004 <br /> F:\Utilities\UTILITY - EMPLOYEE FOLDERS\Larry BroNVu\Wabasso HDD Proposal-Amendment I revTdoc <br />
The URL can be used to link to this page
Your browser does not support the video tag.