My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-043
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-043
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2016 11:02:29 AM
Creation date
9/30/2015 9:30:35 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
02/07/2006
Control Number
2006-043
Agenda Item Number
11.I.4.
Entity Name
McMahon Associates, Inc.
Subject
Amendment No. 1 intersection improvements
Area
CR 510 and US Hwy 1
Supplemental fields
SmeadsoftID
5446
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 . Special Provisions <br /> Technical Special Provisions will be provided for any items of work not standard FDOT <br /> items, and do not conform to FDOT' s Standard Specifications for Road and Bridge <br /> Construction, dated 2004 . <br /> 4. Landscape Maintenance Agreement <br /> As an additional service, information required for the Maintenance agreement shall be <br /> provided to the COUNTY . Written or graphic guide for care of the plantings, irrigation <br /> system and maintenance after the warranty period. Maintenance details and specifications <br /> shall recommend : a mowing schedule and maintained grass height; fertilization <br /> schedules, formulas, rates and methods of application; weeding schedule and method <br /> chemical, mechanical, or manual ; edging schedule; herbicide schedules formulas, rates, <br /> methods of application, precautions; pruning schedule and methods to maintain health and <br /> clear sight requirements; mulching materials, thickness and replacement frequency; <br /> irrigation schedule and warranty period maintenance (flushing, adjustments, clean-up); <br /> litter pick-up, and hardseape care. This Maintenance Plan will be developed in <br /> coordination with the local government entity who assumes the maintenance obligation. <br /> 1. Construction Phase Assistance <br /> Construction phase assistance in excess of that which is included in the original agreement shall be <br /> submitted to the COUNTY under a Supplemental Work Order, if so requested, once the <br /> construction documents have been finalized and construction duration hours been determined . <br /> "SECTION IV - TIME FOR COMPLETION" is being modified to incorporate the following: <br /> The time for completion of the 90% design drawings and permit applications for the scope of services <br /> detailed in this amendment will be ( 14) months. No format plan submittals for the original scope of work <br /> will be made until the work associated with the plan submittals in this amendment is complete. Once <br /> permits are received, 100% design drawings shall be completed 90 days thereafter. <br /> "SECTION V — COMPENSATION" is being modified to incorporate the following: <br /> The COUNTY agrees to pay and the ENGINEER agrees to accept for services rendered pursuant to this <br /> Agreement fees in accordance with the following: <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.