Laserfiche WebLink
ATTACHMENT 1 TO AMENDMENT NO . 3 <br /> INDIAN RIVER COUNTY UTILITIES DEPARTMENT <br /> OPERATIONS CENTER COMPLEX <br /> SCOPE OF SERVICES <br /> Amendment No . 3 modifies the Scope of Services in Work Order No . 1 for design, permitting, <br /> bidding and construction services of the Utilities Department ' s Operations Complex at the <br /> intersection of 41 " Street and 43rd Avenue to include certain additional work activities associated <br /> with installing approximately 3100 linear feet of off- site wastewater force main from the Operations <br /> Complex site to an existing wastewater force main located on 43rd Avenue at 47t Street . <br /> Installation of this force main will provide a wastewater service connection to the remaining <br /> undeveloped County property along 43rd Avenue as well as additional undeveloped and currently <br /> un- serviced parcels east and west of the 43rd Avenue corridor. <br /> The wastewater force main will be sized in accordance with the Utility Department ' s flow <br /> calculation for the 41St Street and 43rd Avenue corridor. A master lift station will be designed for <br /> installation at the new Operations Complex site . This lift station will serve existing and <br /> undeveloped properties along 41 " Street west of 43rd Avenue and undeveloped properties adjacent <br /> to 43rd Avenue, north of 41St Street. The lift station shall meet normal Indian River County design <br /> standards except that it shall include : variable speed pumps ; flow rate data collection ; biological <br /> odor control ; a self contained, automatic, back-up power supply generator; and additional telemetry <br /> input/output for monitoring/control of the additional equipment . <br /> Amendment No . 3 is being implemented at this time so that the wastewater infrastructure <br /> improvements associated with the Operations Complex site development can be integrated with <br /> wastewater service along the 43rd Avenue corridor. When designed, competitively bid and <br /> constructed along with the Operations Complex, an overall cost savings to Indian River County can <br /> be realized. <br /> A description of the Scope of Services for Amendment No . 3 , broken down into the previously <br /> identified Work Tasks included in the original Work Order No . 1 , is provided below . <br /> TASK 1 — PROJECT MANAGEMENT $ 99000.00 <br /> Additional work activities to be completed under Task 1 include the following : <br /> 1 . Project Management Plan — Modify Project Management Plan to include the work of <br /> Amendment 3 , identifying the roles of the various members of the BC Team and their <br /> specific scopes of work, a project staffing plan, a communications plan, a QA/QC plan, and <br /> other procedural information relevant to work on the project . <br /> 2 . Project Kick-Off Meetings — Conduct project review meetings at regular intervals with <br /> Utilities Department staff. The first meeting will be a project kick-off meeting to review the <br /> Amendment No. 3 Attachment 1 _rev2 .doc Page 1 of 4 <br />