Laserfiche WebLink
objectives of the project and the scope , schedule and budget for completion of work. It is <br /> anticipated that subsequent meetings will be held at approximately monthly intervals <br /> thereafter to review the status of work in progress , to resolve any outstanding issues , and to <br /> provide County staff with the opportunity to have input into the project as it proceeds to <br /> completion. <br /> TASK 2 — SITE INVESTIGATIONS $ 59000.00 <br /> Additional work activities to be completed under Task 2 include the following : <br /> 1 . Topographic Survey — Survey existing Road and Bridge Lift Station and its surrounding <br /> area. Survey approximately 1500 feet along the west side of the 43rd Avenue right-of-way <br /> lying north of the project parcel to 47th Street. Perform typical cross sections every 300 feet <br /> along the right-of-way and at major breaks and intersections . Identify surface topographic <br /> features between the centerline of pavement to the edge of right-of-way along the entire <br /> length of the survey. Locate and identify any trees in the right-of-way with a diameter at <br /> breast height (dbh) of 4 inches or greater or major vegetative stands not qualifying as <br /> individual trees which might affect the project design. <br /> 2 . Topographic Survey Drawing — Prepare a certified "Sketch of Information" of the area to be <br /> surveyed, meeting Florida Minimum Technical Standards and as required to meet Chapter <br /> 914 of the Indian River County Land Development Code . An electronic copy of the <br /> topographic survey drawing will be provided to Indian River County in AutoCAD format. <br /> TASK 3 — PRELIMINARY DESIGN PHASE $ 69000.00 <br /> Additional work activities to be completed under Task 3 include the following : <br /> 1 . Preliminary Meetings — Prepare for and attend up to two "programming" meetings with <br /> Indian River County Utility Department engineering staff or their designated agents to <br /> identify design requirements and constraints . <br /> 2 . Design Resort and Conceptual Layout — Perform planning calculations which identify the <br /> areas of service and flows calculated for the project. Determine the appropriate location for <br /> diverting the 41s' Street flows into the proposed collection/transmission system . Design the <br /> diversion and collection system such that the Road and Bridge Lift Station can be taken <br /> "off-line" , if possible . Identify the system component sizes , quantities and anticipated <br /> installed costs . <br /> TASK 4 — SITE PLAN APPROVAL $ 0. 00 <br /> Amendment No . 3 does not require any additional work under Task 4 . The master lift station has <br /> been anticipated and permitted in the Operations Complex site plan as a "future" installation. <br /> Amendment No. 3 Attachment 1 _rev2 .doc Page 2 of 4 <br />