My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-056
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2016 10:32:39 AM
Creation date
9/30/2015 8:21:15 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Third Amendment
Approved Date
02/08/2005
Control Number
2005-056
Agenda Item Number
11.J.1
Entity Name
Brown and Caldwell
Subject
Installation of Wastewater force main at Utilities Complex
Amendment No.3 to Work Order No.1
Area
Utilities Operations Center Complex
Archived Roll/Disk#
4000
Supplemental fields
SmeadsoftID
4661
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
objectives of the project and the scope , schedule and budget for completion of work. It is <br /> anticipated that subsequent meetings will be held at approximately monthly intervals <br /> thereafter to review the status of work in progress , to resolve any outstanding issues , and to <br /> provide County staff with the opportunity to have input into the project as it proceeds to <br /> completion. <br /> TASK 2 — SITE INVESTIGATIONS $ 59000.00 <br /> Additional work activities to be completed under Task 2 include the following : <br /> 1 . Topographic Survey — Survey existing Road and Bridge Lift Station and its surrounding <br /> area. Survey approximately 1500 feet along the west side of the 43rd Avenue right-of-way <br /> lying north of the project parcel to 47th Street. Perform typical cross sections every 300 feet <br /> along the right-of-way and at major breaks and intersections . Identify surface topographic <br /> features between the centerline of pavement to the edge of right-of-way along the entire <br /> length of the survey. Locate and identify any trees in the right-of-way with a diameter at <br /> breast height (dbh) of 4 inches or greater or major vegetative stands not qualifying as <br /> individual trees which might affect the project design. <br /> 2 . Topographic Survey Drawing — Prepare a certified "Sketch of Information" of the area to be <br /> surveyed, meeting Florida Minimum Technical Standards and as required to meet Chapter <br /> 914 of the Indian River County Land Development Code . An electronic copy of the <br /> topographic survey drawing will be provided to Indian River County in AutoCAD format. <br /> TASK 3 — PRELIMINARY DESIGN PHASE $ 69000.00 <br /> Additional work activities to be completed under Task 3 include the following : <br /> 1 . Preliminary Meetings — Prepare for and attend up to two "programming" meetings with <br /> Indian River County Utility Department engineering staff or their designated agents to <br /> identify design requirements and constraints . <br /> 2 . Design Resort and Conceptual Layout — Perform planning calculations which identify the <br /> areas of service and flows calculated for the project. Determine the appropriate location for <br /> diverting the 41s' Street flows into the proposed collection/transmission system . Design the <br /> diversion and collection system such that the Road and Bridge Lift Station can be taken <br /> "off-line" , if possible . Identify the system component sizes , quantities and anticipated <br /> installed costs . <br /> TASK 4 — SITE PLAN APPROVAL $ 0. 00 <br /> Amendment No . 3 does not require any additional work under Task 4 . The master lift station has <br /> been anticipated and permitted in the Operations Complex site plan as a "future" installation. <br /> Amendment No. 3 Attachment 1 _rev2 .doc Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.