Laserfiche WebLink
TASK 5 — CONSTRUCTION PLANS AND SPECIFICATIONS $ 25,000. 00 <br /> Additional work activities to be completed under Task 5 include the following : <br /> 1 . Gravity Collection Main - Redesign the Operations Complex wastewater collection system <br /> to flow from the Road and Bridge Lift Station to the proposed master lift station . Size the <br /> system for diversion of flow from the 41St Street transmission system into the new collection <br /> system. Provide gravity extensions to the north and east under 43rd Avenue to service areas <br /> which are currently undeveloped. Prepare plan and profile drawings for installation of the <br /> gravity sewer. Prepare technical specifications for placement on the construction plans . <br /> 2 . Wastewater Force Main — Prepare plan and profile drawings indicating the proposed <br /> installation and restoration for the wastewater transmission main. Prepare typical and project <br /> specific details for installation of the main. Prepare technical specifications for placement <br /> on the construction plans . <br /> 3 . Master Lift Station — Using Indian River Standard Utility Details , design a master <br /> wastewater lift station to service the regional area. Provide design plans and details for the <br /> following additional items : variable speed pumps ; flow rate data collection; biological odor <br /> control ; a self contained, automatic, back-up power supply generator ; and additional <br /> telemetry input/output for monitoring/control of the additional equipment. Prepare technical <br /> specifications for placement on the construction plans . <br /> 4 . Design Review and Cost Estimates — Conduct design reviews with Indian River County <br /> Utilities Department staff at approximately the 50, 90 and 100 percent design completion <br /> levels . An Engineer' s Opinion of Probable Cost will be prepared as part of each design <br /> review submittal . <br /> TASK 6 — PERMITTING $ 69000.00 <br /> Additional work activities to be completed under Task 6 include the following : <br /> 1 . Wastewater System Permitting — After completion of the 90 percent drawings, prepare an <br /> individual FDEP wastewater permit application, submit the application and attachments , and <br /> assist the County in obtaining the permit from FDEP . Prepare an Indian River County right- <br /> of-way application, submit the application and attachments, and assist the County in <br /> obtaining the right-of-way permit . Prepare an Indian River Farms Water Control District <br /> utility crossing application, submit the application and attachments, and assist the County in <br /> obtaining the utility crossing permit. <br /> 2 . Permit Fees — Payment of permit fees is included in this Scope of Work. A budget <br /> allocation of $ 1 ,250 has been included for fees associated with the FDEP wastewater permit, <br /> the Indian River Farms Water Control District permit, and the Indian River County right-of- <br /> way permit. <br /> Amendment No. 3 Attachment 1 _revldoc Page 3 of 4 <br />