My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-404
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-404
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 4:14:59 PM
Creation date
9/30/2015 10:23:11 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
11/21/2006
Control Number
2006-404
Agenda Item Number
11.I.1.
Entity Name
Stanley Consultants, Inc.
Subject
Final design and plans preparation for utility relocations
Area
CR 510 from CR 512 to east of 75th. Court
Supplemental fields
SmeadsoftID
5972
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
111 , 1 <br /> AMENDMENT 1 a,Q�� Va <br /> FINAL DESIGN AND PLANS PREPARATION FOR <br /> CR 510 from CR 512 to east of 75th Court <br /> This is an amendment to the existing Final Design and Plans Preparation services agreement <br /> (AGREEMENT), dated November 17, 2005 , by and between INDIAN RIVER COUNTY, hereinafter <br /> referred to as the COUNTY, and STANLEY CONSULTANTS, INC ., hereinafter referred to as the <br /> ENGINEER. This amendment addresses changes in "Section I — Project limits and Description, Section III — <br /> Scope of Services, Section IV — Time for Completion, and Section V - Compensation" of the AGREEMENT. <br /> Amendment Description <br /> SECTION I - PROJECT LIMITS AND DESCRIPTION is being modified to incorporate the following <br /> the engineering services which are required : <br /> • Design slope stabilization measures for the 89`h Street canal. <br /> • Locate subsurface utilities at four bridges and at two box culverts. <br /> • Coordinate utility relocation for non-County utilities. <br /> • Design utility relocations and new service stub outs for County owned water and sewer utilities. <br /> SECTION II — not applicable <br /> SECTION III - SCOPE OF SERVICES is being modified to incorporate the following: <br /> The preparation of construction plans and documents for utility relocation in conjunction with the <br /> design of CR 510 roadway plans. <br /> The ENGINEER agrees to perform professional roadway design and related services in connection <br /> with the project as required and set forth in the following: <br /> A. Design Survey (Burdette & Associates) <br /> The survey will include: <br /> 1 . Set reference points for six baseline control points per request of the County Surveyor. <br /> The points are EBLC2, EBLC3 , EBLC5 , EBLC6, EBLC8 and EBLC9. The reference <br /> points will be included in the roadway construction plan set. <br /> 2. Survey the land between the pond and 91 " Avenue; from 891h Street (STA 924+00) to <br /> 88`h Street (STA 917+00). The topographic and digital terrain model will be updated. <br /> 3 . Identify and paint baseline stations at 400 foot intervals, throughout project for <br /> geotechnical and utility locations; required due to resurfacing of roadway that had <br /> covered previous markings. <br /> 4. Stake 200 foot intervals on 89`h Street for geotechnical and canal work along 89'h Street; <br /> required due to typical section changes needed to minimize R/W impact. <br /> 5 . Locate crucial building corners, driveways, swales, and culverts on newly built home <br /> sites in Vero Lakes Estates adjacent to 89'h Street, 87`h Street, and 91 " Avenue. <br /> CR 510 Amendment 1 Page 1 of 5 10/26/06 <br />
The URL can be used to link to this page
Your browser does not support the video tag.