Laserfiche WebLink
B. Geotechnical Investigation (GCME) <br /> Additional geotechnical services will include the following tasks : <br /> 1 . Geotechnical soil borings along 89`x' Street are detailed as: 10 auger borings six feet deep, <br /> 4 auger borings 20 feet deep. Perform index property tests and estimate LBR for roadway <br /> design . <br /> 2. Geotechnical engineering services for canal-fill slope stability analysis, roadway <br /> embankment adjacent to canal, recommendation on method of slope stabilization and <br /> documentation of analysis . <br /> C . Utility Services (Stanlev Consultants <br /> Utility design and relocation services are required. Additional design services will include the <br /> following tasks: <br /> 1 . Perform design for relocations of existing County owned water and sewer utilities <br /> resulting from the highway improvements. <br /> 2 . Perform the design of water and sewer utility stub outs to the existing 16 inch water main <br /> and 12 inch sewer force main with spacing of 500 foot to 1000 foot intervals along the <br /> project. <br /> 3 . Identify utility conflicts resulting from roadway project. <br /> 4. Perforin utility coordination with utility owners to minimize relocation. <br /> 5 . Prepare Department of Environmental Protection (DEP) permit package for water and <br /> sewer improvements. Includes the preparation of DEP forms. Does not include the <br /> required construction inspection services associated with construction complete <br /> certification. <br /> D. Utility Subsurface Locates (InfraMap Corp <br /> Horizontal and vertical location of subsurface utilities is required . Additional design services will <br /> include the following tasks: <br /> 1 . Perform a total of twenty (20) subsurface utility locations using air/vacuum method at the <br /> proposed bridges and box culverts. <br /> 2. Survey the horizontal and vertical location of the utility at each subsurface penetration. <br /> E. Deliverables <br /> 1 . Survey — Updated topographic and terrain model. Set reference points in field. <br /> 2 . Geotech — Report for 891h Street canal soil conditions and slope stability recommendations. <br /> 3 . Utility Design and Relocation — Stub out locations will be added to roadway plan sheets. <br /> Added to the roadway plan set will be General Notes and Quantities for Utilities; Utility Detail <br /> Sheets; and Utility Subsurface Verification Summary Sheet. Utility cost estimates will be <br /> provided. DEP Permit Package for water and sewer stub outs and relocations will be provided. <br /> CR 510 Amendment 1 Page 2 of 5 10/26/06 <br />