My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-242
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-242
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2016 1:56:14 PM
Creation date
9/30/2015 8:58:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
First Amendment
Approved Date
07/12/2005
Control Number
2005-242
Agenda Item Number
11.J.4
Entity Name
Camp Dresser & McKee Inc.
Subject
Amendment No.1 to Work Order No.1
North County Water Treatment Plant Phase II
Supplemental fields
SmeadsoftID
5082
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
review. CDM will schedule and conduct a review meeting with IRC staff and address <br /> appropriate IRC review comments prior to bidding the project. <br /> Subtask 2.3 Final Contract Document Submittal : No Changes <br /> Subtask 2. 4 Probable Construction Cost: No Changes <br /> TASK 3 . 0 PERMITTING SERVICES (Amendment I Additional Services) <br /> This task provides for the preparation of necessary permit applications, meetings, and <br /> negotiation with regulatory agencies and preparation of responses to Requests for Additional <br /> Information (RAI) . <br /> CDM has prepared applications for permits with the FDEP and has answered one RAI. Permit- <br /> related work shall include furnishing required data, drawings, and other information requested <br /> and assisting IRC to obtain required permit approvals . CDM will submit permit applications to <br /> IRC for review and meet with IRC as required to discuss the review comments . CDM will revise <br /> the applications as required and submit to appropriate regulatory agencies for review and <br /> approval . The following permits could be impacted by increasing the plant flows : <br /> ■ Florida Department of Environmental Protection (FDEP) will require a permit to <br /> construct plant process and site improvements . CDM will submit a modification to the <br /> permit application under review to expand the plant to full build-out. <br /> ■ St. John's River Water Management District (SJRWMD) and IRC Engineering <br /> Department will require an Environmental Resources Permit (ERP) for modifications to <br /> the existing stormwater drainage system at the plant site. The existing permit is a <br /> Management and Storage of Surface Water (MSSW) permit that was issued in 1996 . The <br /> increase in impervious area will require substantial revisions to the stormwater swale <br /> and detention areas . <br /> ■ Modifications to IRC Is current Consumptive Use Permit (CUP) from SJRWMD for raw <br /> water supply will be required . All work pertaining to the preparation and submittal of <br /> said permit will be Performed By Others and is not included in this scope of services . <br /> ■ Concentrate disposal permitting is currently underway by others . Permitting services for <br /> concentrate disposal will require an amendment to this contract. <br /> TASK 4 . 0 BIDDING ASSISTANCE SERVICES <br /> CDM will negotiate a price with the current membrane supplier to avoid changing the pum in <br /> requirements and existing hydraulic conditions . CDM will include the existing Amendment <br /> g <br /> membranes with a clause for IRC to purchase additional membranes for the South County <br /> Water Treatment Plant at the same price . <br /> CDM will update IRC' s procurement documents to the latest EJCDC 2002 version. <br /> B-5 <br /> mh2080.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.