Laserfiche WebLink
TASK 5 . 0 CONTRACT ADMINISTRATION/ PERIODIC FIELD REPRESENTATION <br /> CDM proposes to provide construction administration and periodic field representation <br /> as <br /> outlined in the original scope of work but with an additional 10 weeks of construction time . <br /> Subtask 5 . 6 CDM will provide a Resident Project Representative (RPR) during the <br /> construction of the project, to observe the performance of the wok of the <br /> Contractor. Budget for the representative is based on the additional 10 weeks <br /> construction duration at approximately 14 hours per week . The RPR as CDM' s <br /> agent will act as directed by and under the supervision of CDM, and will confer <br /> with CDM regarding his actions . The RPR' s dealings in matters regarding the on- <br /> site work shall in general be only with CDM and the Contractor, and dealings <br /> with subcontractors shall only be through or with the full knowledge of the <br /> Contractor. Written communication with IRC will be only through or as directed <br /> by CDM. <br /> OTHER SERVICES NOT INCLUDED IN THIS SCOPE OF SERVICES (No Changes <br /> The following list of items is not included in this Scope of Services ) <br /> separate proposals or will be negotiated separately with IRC, if requiredill be addressed in <br /> til ti <br /> A . Excavation for field verification of the actual locations of existing underground and structures . If field verification is necessary, <br /> excavation shall be pro ded by IRC as <br /> directed by CDM. <br /> B • Services associated with assisting IRC in the review and evaluation of patent-related <br /> disputes, issues, or claims including preparing to serve or serving as a consultant or <br /> witness for IRC in litigation, arbitration, public or private hearings, or other legal or <br /> administrative proceedings involving patent-related disputes, issues, or claims . <br /> C• SJRWMD Consumptive Use and FDEP Well Construction permitting and wells stem <br /> and raw water piping outside of the plant fence/ offsite design, biddin y <br /> construction are to be conducted by others . g� and <br /> D. Concentrate disposal relocation permitting is currently underway by others . Services for <br /> concentrate disposal permitting will be contract amendment, if required . <br /> E Special services associated with construction including operating manuals and start-up <br /> p <br /> F• Start-up Instrumentation Programming services <br /> G . Additional services in connection with the project not otherwise provided for in this <br /> Scope of Services . <br /> B-6 <br /> mh2080. doc <br />