My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-184
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-184
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2016 12:11:37 PM
Creation date
9/30/2015 10:50:21 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
First Amendment
Approved Date
06/05/2007
Control Number
2007-184
Agenda Item Number
11.J.1
Entity Name
Masteller and Moler,Inc.
Subject
Amendment No.1 to Work Order No.1 Grand Harbor Project
Area
Grand Harbor
Supplemental fields
SmeadsoftID
6324
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Our File 0544 <br /> May 14, 2007 <br /> NON-EXCLUSSIVE PROFESSIONAL ENGINEERING AGREEMENT <br /> CONTINUING CONSULTING SERVICES <br /> ATTACHMENT <br /> • Background <br /> As a result of discussions between the Grand Harbor project developers and the Indian River <br /> County Utilities Department, agreement has been reached regarding the proposed 16" Brine <br /> Force Main through the Grand Harbor project between US # 1 and the proposed Spoonbill Marsh <br /> Brine Disposal site. As a result of the agreed force main route alignment, revisions must be <br /> made to the plans which were prepared in accordance with the original contract dated October 4, <br /> 2005 . In addition to the plan revisions, the Utility Department has also determined that it would <br /> be cost effective to also include the design and preparation of contract plans covering the <br /> extension of a 12" reuse main from the Lateral G Canal eastward through the Grand Harbor <br /> property line at the east end of 57`" Street. The design and anticipated simultaneous construction <br /> of both pipelines should result in a better engineered solution and a substantial reduction and <br /> construction costs . The purpose of this Addendum # 1 is to provide for the above described <br /> revisions to the 16" brine force main and the addition of the 12" section of reuse main to the <br /> Grand Harbor project site. <br /> The estimated project construction cost for the revised brine force main route and the 12" reuse <br /> main is $ 1 , 340,000. 00 <br /> A brief description of the Scope of Services for this Addendum # 1 to Work Order # 1 is provided <br /> below. <br /> • Scope Of Services <br /> Task A — Construction Plan & Permittine <br /> Masteller & Moler, Inc. will utilize our existing plans showing the 16" brine force main from <br /> Bent Pine connection east to the Grand Harbor property line at the end of 57`h Street. We will <br /> modify this portion of our plans by adding the design and construction information which will <br /> provide for the construction of a I2" reuse main. The proposed 12" reuse main will connect to <br /> the existing 16" reuse main along the east side of Lateral G Canal and extending east to the <br /> Grand Harbor property line at the east end of 57`h Street. If and where necessary, the location of <br /> the 16" brine force main as shown on the original plans will be relocated in order to <br /> accommodate the parallel 12" reuse main. As with the 16" brine force main, the 12" reuse main <br /> will be crossing the FECRR, Old Dixie Highway and US # 1 before its termination at the Grand <br /> Harbor property line. The total length of the reuse main is approximately 3 ,000 ' and the total <br />
The URL can be used to link to this page
Your browser does not support the video tag.