My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-168
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-168
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2016 10:05:01 AM
Creation date
9/30/2015 10:48:57 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
First Amendment
Approved Date
05/22/2007
Control Number
2007-168
Agenda Item Number
11.J.2
Entity Name
Kimley-Horn and Associates
Subject
Amendment No.1 to Work Order 14
Area
South RO Plant Site
Supplemental fields
SmeadsoftID
6307
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment #1 <br /> To <br /> Amendment 1 <br /> To <br /> Work Order Number 14 <br /> PROJECT DESCRIPTION <br /> This amendment modifies Work Order #14 to include additional bidding phase services and <br /> construction phase services for portions of the project which are to be separated from the original <br /> design. The overall project design has been completed and permitted. A portion of the project <br /> has been authorized as a change order to TLC Diversified, Inc., a contractor performing similar <br /> work on the existing South RO plant site. This work included feed-water pump upgrades, <br /> membrane replacement, train piping modifications, and installation of profile valves and inter- <br /> stage valves . As a result, the remaining work including high service pump replacement, permeate <br /> acid injection point relocation, chemical system modifications, and bulk scale inhibitor tank <br /> installation will be advertised for bidding. <br /> The following scope of work under this amendment consists of: <br /> Task 1. Preparation of Bid Documents and Bidding Phase Services <br /> Consultant will provide bidding phase services consisting of advertisement coordination, and <br /> preparation of bid documents which will incorporate the project design drawings and <br /> specifications already prepared under the original work order. The Consultant will incorporate <br /> the Owner's front-end contract documents into the Project Manual, which will serve as the <br /> Contract between the Owner and the selected contractor. Consultant will distribute and sell <br /> project manuals, consisting of drawings, specifications, and addendums. Consultant will respond <br /> to contractor questions and prepare up to two addendums, if required, which will be distributed to <br /> all the contract document holders. Any revisions to the Owner' s contract documents during the <br /> construction phase canbe provided by the Consultant, as additional services. <br /> Consultant will separate the design drawings, which are applicable to this project, into one ( 1 ) bid <br /> package, including technical specifications already prepared under the original work order. <br /> Consultant will review bids and provide analysis and identification of the lowest responsive <br /> responsible bidder to IRCU. <br /> It is assumed that revisions to the front-end documents will be provided by Owner and final <br /> versions furnished to Consultant for inclusion into the project manual . <br /> Task 2 - Services During Construction <br /> It is anticipated that additional construction phase services for this work will need to cover seven <br /> months of activity, of which will be concurrent with TLC ' s work and extend up to two (2) months <br /> beyond TLC' s contract. Although some economy of field observation time can be utilized with <br /> two contractors on the same site, additional coordination time will be required due to two separate <br /> contractors having two independent schedules. On-site construction observations will be provided <br /> in proportion to the level of activity with the selected contractor. <br /> CADocuments and Settings\tenysouthard\J . al Settings\Temporary Intemet Files\OLK41 \South RO Plant Upgrades - Amendment <br /> l .doc Page I <br />
The URL can be used to link to this page
Your browser does not support the video tag.