First Amendment
Approved Date
05/22/2007
Control Number
2007-168
Agenda Item Number
11.J.2
Entity Name
Kimley-Horn and Associates
Subject
Amendment No.1 to Work Order 14
Area
South RO Plant Site
Supplemental fields
SmeadsoftID
6307
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Consultant will provide construction phase services for this project, consisting of shop <br /> drawing review, meeting attendance, field observation, start up assistance, preparation of record <br /> drawings, and final certification of completion of the project. <br /> The Consultant will attend one ( 1 ) pre-work meeting at the project site . <br /> Shop drawing submittals will be reviewed for conformance with the intent of the Contract <br /> Documents. Shop drawings will be submitted directly to the Consultant and reviewed submittals <br /> returned to the Contractor and Indian River County Utilities. <br /> The Consultant will coordinate and attend one ( 1 ) project status meeting per month for <br /> coordination and status updates of the project with the selected, Contractor and Owner. The <br /> Consultant will provide observation of construction for the duration of the project described <br /> herein. The Consultant will also review pay requests and provide recommendations for payment <br /> to Indian River County Utilities based on progress of the work. <br /> Observation will be provided by a field engineer. Total observation time is anticipated to be <br /> approximately 80 hours in addition to the original work order. This is based on approximately 8 <br /> hours per week of field observations for two (2) months of activity remaining beyond the TLC <br /> contract. On-site observation time during the first five (5) months will be included under the <br /> original work order # 14 scope. <br /> The Consultant's visits will be for the purpose of endeavoring to provide the Owner a greater <br /> degree of confidence that the completed work of its Contractors will generally conform to the <br /> construction documents prepared by the Consultant. The Consultant neither guarantees the <br /> performance of Contractors, nor assumes responsibility for any Contractor' s failure to perform its <br /> work in accordance with the Contract Documents. Work that the Consultant believes does not <br /> comply with the Contract Documents will be brought to the attention of Indian River County <br /> Utilities and the Contractor. The Consultant shall have no responsibility for any Contractor's <br /> means, methods, techniques, equipment choice and usage, sequence, schedule, safety programs, <br /> or safety practices, nor shall the Consultant have any authority or responsibility to stop or direct <br /> the work of any Contractor. <br /> A punch-list will be prepared for the items that need to be completed for final closeout of the <br /> project. The Consultant will perform two site visits with the Contractor to review the status of the <br /> completion of these punch-list items. <br /> On-site testing of the high service pump control logic will be conducted by the Contractor. <br /> Consultant will observe on-site testing of the automated operation of the high service pump <br /> operation following completion of construction by the contractor. <br /> SCHEDULE <br /> Preparation of design and technical specification documents under Task 1 is anticipated to be <br /> complete within 3 weeks of notice to proceed. The advertisement phase is dependent upon <br /> Owners review and approval of the bid documents for bidding, and may be completed within 2-5 <br /> weeks after the design/technical documents are completed. Task 2 is anticipated to be <br /> approximately seven (7) months after notice to proceed is issued to the qualified bidder. <br /> C:\Documents and Settings\tetrysouthardV"al Settingffemporary Intemet Files\OIX41\South RO Plant Upgrades - Amendment <br /> t .doc Page 2 <br />