Task 5.0 General Services during Construction <br /> Additional general services during construction are anticipated as a result of the design <br /> modifications described above. The additional services will provide for additional shop <br /> drawing review, responses to RAIs, inspections, testing and other related work associated with <br /> the additional systems and equipment included due to the modifications to the facility under <br /> preliminary design. The requested budget amendment for Task 5.0 is presented in Table 1. The <br /> projected project labor disaggregation is provided in Table 2. <br /> OTHER SERVICES NOT INCLUDED IN THIS SCOPE OF SERVICES (No Changes) <br /> The following list of items is not included in this Scope of Services but will be addressed in <br /> separate proposals or will be negotiated separately with the County, if required: <br /> A. Excavation for field verification of the actual locations of existing underground utilities and <br /> structures. If field verification is necessary, excavation shall be provided by the County as <br /> directed by CDM. <br /> B. Services associated with assisting the County in the review and evaluation of patent-related <br /> disputes, issues, or claims including preparing to serve or serving as a consultant or witness <br /> for the County in litigation, arbitration, public or private hearings, or other legal or <br /> administrative proceedings involving patent-related disputes, issues, or claims. <br /> C. Additional services in connection with the project not otherwise provided for in this <br /> amended Scope of Services. <br /> COUNTY RESPONSIBILITIES <br /> The County shall provide the following to CDM in a timely manner: <br /> ■ Fees for permits, <br /> ■ Review of CDM work products, <br /> ■ Standard Front-End (Division 0) Contract Documents. <br /> SCHEDULE <br /> The Project Schedule has been revised as follows: <br /> Start/ Approval November 2005 <br /> Site Determination April 2006 <br /> Preliminary Design Draft Complete August 2006 <br /> Final Design Report Complete August 2006 (Revised December 2006) <br /> Permitting January 2007 - September 2007 <br /> Bidding November 2007 <br /> Construction December 2007 - November 2008 <br /> 4 jb1494.doc <br />