Laserfiche WebLink
Task 2.0 Permitting Services <br /> This task provides for the preparation of necessary permit applications, meetings, and <br /> negotiation with regulatory agencies and preparation of responses to Requests for Additional <br /> Information (RAI) by County Planning and Zoning Department. During preparation of the <br /> preliminary design, additional FDEP permit requirements not included in the original scope of <br /> services were identified. The additional permits included: <br /> ■ Notice of Intent to Use General Permit for Construction of Wastewater <br /> Collection/Transmission system, <br /> ■ Notice of Intent to Use General Permit for Construction of Water Main Extension, and <br /> ■ Title V Air Construction Permitting determination <br /> Permit applications for the identified General permits were prepared for County staff and <br /> submitted to FDEP by CDM. CDM conducted a regulatory review for Title V Air permitting <br /> requirements and submitted a letter of determination to FDEP Title V Air Permitting for the <br /> facility. The preliminary response from FDEP indicated that an Air Construction permit would <br /> be required for the facility' s emergency generator and did not address permitting requirements <br /> for the facility's odor control system. Upon further review of the relevant regulations by CDM <br /> and additional communications with FDEP, it was determined that Air Construction permits <br /> would not be required for the emergency generator or the odor control system. A follow up <br /> letter indicating the above and withdrawing the initial request for determination was submitted <br /> to FDEP by CDM. <br /> A revision of the county site plan application was also required due to a miscommunication <br /> from the County Planning and Zoning Department. The site plan application had to be revised <br /> from application for Administrative Approval to application for Major Site Plan Review which <br /> required preparation of a new application, additional drawing submittals and additional <br /> meeting time. The requested budget amendment for Task 2.0 is presented in Table 1 . The <br /> projected project labor disaggregation is provided in Table 2. <br /> Task 3. 0 Final Design <br /> This task provides for the preparation of final design and bid ready documents for the biosofids <br /> dewatering facility. <br /> ■ Aeration System for holding tank mixing and phosphorus mitigation <br /> ■ Mechanical Blowers for Aeration System <br /> ■ Expanded Electrical/ Laboratory Building <br /> ■ Water and wastewater pipeline <br /> The number of drawing sheets included under final design has increased from 45 sheets <br /> originally specified to 74 sheets to account for modifications to the design during the <br /> preliminary design phase. The requested budget amendment for Task 3.0 is presented in Table <br /> 1 . The projected project labor disaggregation is provided in Table 2. <br /> Task 4.0 Bidding Assistance Services <br /> (No change in this Amendment) <br /> 3 ie1494.aoc <br />