My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-389
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-389
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2025 10:02:46 AM
Creation date
9/30/2015 11:27:27 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
First Amendment
Approved Date
11/13/2007
Control Number
2007-389
Agenda Item Number
11.J.1
Entity Name
Schulke,Bittle & Stoddard LLC
Subject
Vero Lake Estates Master Water Main Project
Amendment No.1 to Work Order No.4
Area
Vero Lakes Estates
Supplemental fields
SmeadsoftID
6685
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 1 <br />(Scope of Work) <br />Scope of Services <br />Schulke, Bittle & Stoddard, L.L.C. will provide services including surveying, geotechnical <br />exploration, engineering design, hydraulic analysis/model of the Master Planned 12" Water Main <br />and future water main grid/network in Vero Lake Estates, preparation of Construction Plans, <br />preparation and submittal of permit applications, construction administration and periodic <br />construction field inspection for the proposed project that will provide for the construction of <br />approximately 25,590 if of 12" P.V.C. and H.D.P.E. Master Planned 12" Water Main and <br />approximately 1,335 If of 6" P.V.C. and H.D.P.E. Water Main, and associated appurtenances to <br />be located and constructed along the following route: <br />A 12" P.V.C. and H.D.P.E. Water Main is proposed as follows: <br />to prepare an <br />- Connection is made to a 20" D.I.P. water main at the <br />southeast corner of CR512 and <br />104" Ave. intersection. <br />- On 104"' Ave.; from CR512 south 1300 If to 93`d St. <br />The proposed changes will provide for the construction <br />- On 93`d St.; from 104"' Ave, east 320 If to 103`d Ct. <br />for <br />- On 103`d Ct.; from 93`d St., south 2735 if to 89"' St. <br />protection for areas within Vero Lake Estates located in the farthest western <br />- On 89t1i St.; from 103`d Ct., west 335 if to 104"' Ave. <br />of the existing <br />- On 104'h Ave.; from 89th St., south 6605 If to 791" St. <br />to be added at <br />- On 79"' St.; from 104th Ave, east 8650 if to 91" Ave. <br />St., from 104'' <br />- On 9151 Ave.; from 79th St., north 4335 If to 8511i PI. <br />a twelve (12) <br />- On 85'11 PI.; from 91st Ave., east 650 If to 90'11 Ave (CR510) <br />- Connection is made to a 16" D.I.P. water main at the <br />southwest corner of 85"' Pl. and <br />90"' Ave (CR510) intersection. <br />And a 6" P.V.C. and H.D.P.E. Water Main is proposed as follows: <br />- Connect to the proposed 12" P.V.C. Water Main at <br />104"' Ave. and 87`1' St., extend <br />west on 87t1i St., 665 If to 105"' Ave. <br />Connect to the proposed 12" P.V.C. Water Main at <br />104th Ave and 83`d St., extend <br />west on 83`d St., 670 if to 105th Ave <br />And a 12" P.V.C. and H.D.P.E. Water Main is proposed as follows: <br />- Connect to the proposed 12" P.V.C. Water Main at 104"' Ave and 79"' St., extend <br />west on 79"' St. 660 If to 105t1i Ave <br />See Exhibit "A" for location and Exhibit "B" for cost estimate. <br />The estimated construction cost of this project is $2,132,898.86. <br />Descrintion of Amendment <br />Schulke, Bittle & Stoddard, L.L.C. has been directed <br />to prepare an <br />Amendment to the <br />Work Order, with changes generally described as follows: <br />The proposed changes will provide for the construction <br />of water mains <br />for <br />additional fire <br />protection for areas within Vero Lake Estates located in the farthest western <br />area <br />of the existing <br />residential development. Six (6) inch water mains are proposed <br />to be added at <br />87"' <br />St., from 104'' <br />Ave to 105th Ave; at 83`d St. from 104th Ave. to 105'hAve; and <br />a twelve (12) <br />inch <br />water main is <br />proposed to be added at 79"' St., from 104"' Ave. to 105"' Ave. <br />Attachment I <br />Work Order No. 4 with Schulke, Bittle & Stoddard, L LG <br />Pg. 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.