Laserfiche WebLink
Attachment I <br />(Scope of Work, cont'd) <br />Changes to the Work Order No. 4 will include: <br />TASK 1 - Additional route survey of 87t1i St., 83rd St. and 79" St. (approximately <br />1995 If) <br />TASK 2 - Add new water mains to the hydraulic model previously developed, and <br />determine fire flow capacity <br />Prepare construction drawings of the new water main routes on 87d' <br />St., 83rd St., and 79'h St. <br />Prepare and submit permit application to Florida Department of <br />Environmental Protection and Indian River County Engineering <br />Department <br />Prepare specifications and change order documents (add new work to <br />construction contract previously awarded) <br />TASK 3 - Additional construction administration and field inspections <br />In order <br />to execute this <br />project in the most <br />cost effective manner with the most aggressive <br />schedule, <br />Schulke, Bittle <br />& Stoddard, L.L.C. is <br />using the following sub -consultants: <br />Houston, Schulke, Bittle & Stoddard, Inc. for the route survey. <br />KSM Engineering & Testing, Inc. for soil boring and testing information. <br />Attachment I <br />Work Order No 4 with Schulke, Bittle d Stoddard, L.L.C. <br />Pg 1ofl <br />