My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-245
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-245
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2016 10:24:14 AM
Creation date
9/30/2015 11:00:21 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"SECTION VIII — EXTRA WORK" is being modified to incorporate the following: <br /> In the event extra work is necessary by the ENGINEER due to a change in scope of the project, such work <br /> shall be the subject of a supplemental Work Order approved by the Board of County Commissioners. The <br /> work shall be completed in accordance with the following rate schedule : <br /> Principals $ 225 .00 <br /> Project Manager $ 170.00 <br /> Senior Engineer $ 135 .00 <br /> Engineer $ 95 .00 <br /> Senior CADD Designer $ 110.00 <br /> CADD Designer $ 80.00 <br /> Chief of Surveys $ 130.00 <br /> Party Chief $ 115 .00 <br /> Survey Technician $ 85 .00 <br /> Field Crew/Daily Cost $ 19250.00 <br /> Traffic Control/Construction Specialist $ 115 .00 <br /> Field Traffic Count Personnel $ 40 .00 <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.