Laserfiche WebLink
Hourly Rate Components Amendment 2 Total Contract <br /> 4 lane/2 lane Roadway Transition $ 0.00 $ 71500.00 <br /> Geotechnical Investigation $ 0.00 $ 225760.00 <br /> Retention Pond Design $ 0 .00 $ 525542 .00 <br /> Landscape Details/Maintenance $ 0.00 $ 6,000 .00 <br /> Utility Location Survey $ 0.00 $ 12,000 .00 <br /> Utility Soft-dig Location Survey $ 37,350.00 $ 37,350 .00(2) <br /> (drainage design) (83 @ $450) <br /> MOT for Utility Soft-dig $ 16,000.00 $ 16,000 .00 <br /> (8 set-ups @ $2,000 ea) <br /> Special Signal Pole Design $ 0.000) $ 16,000.00 <br /> Parcel Sketches & Legal Descriptions @ $375 $ 0.00 $ 38,250.00 <br /> Parcel Sketches & Legal Descriptions @ $600 $ 61600.00 $ 6,600.00 <br /> ( 11 estimated parcels) <br /> Parcel Staking ( 10 @ $600.00) $ 6,000.00 $ 61000.00 <br /> Construction Phase Assistance $ 0.00 $ 20,000.00 <br /> Sub-total $ 655950.00 $ 241 ,002.00 <br /> Grand Totals $ 1409680.00 $924,204.00 <br /> ( 1 ) The fee for the special mast arm design, with a light standard will be considered an hourly <br /> compensation, and the funds/fee provided in the original agreement will be utilized. <br /> (2) It is assumed that 40 water valve/box and manhole locations may be located by GPS coordinates within <br /> the limits of this project, and included in this cost. <br /> 7 <br />