Laserfiche WebLink
a. Perform approximately 83 subsurface utility locations using air/vacuum method at the <br /> conflicts with the proposed storm sewer facilities and proposed signalization mast arms <br /> with existing subsurface utilities owned and operated by Indian River County. <br /> b. The Utility Department of Indian River County is interested in acquiring GPS coordinates <br /> for the existing water and sanitary sewer facilities within the project limits. The facilities <br /> for which they desire GPS locates, are for water valve/box locations and sanitary <br /> manholes. It is assumed that these locates are estimated to be for 40 locations. It is <br /> further assumed that this effort could be associated with the soft dig effort. <br /> c. At times, and due to the location of the utility subsurface locates, maintenance of traffic <br /> (MOT) may be required. <br /> "SECTION IV - TIME FOR COMPLETION" is being modified to incorporate the following: <br /> The time for completion of the 90% design drawings for the scope of services detailed in this amendment <br /> (number 2) will be four (4) months from the formal execution of this amendment (number 2). The location <br /> of the drainage pond sites, may however, affect this estimated project schedule. <br /> "SECTION V — COMPENSATION" is being modified to incorporate the following: <br /> The COUNTY agrees to pay and the ENGINEER agrees to accept for services rendered pursuant to this <br /> Agreement fees in accordance with the following: <br /> A. Professional Services Fee <br /> 1 . The basic compensation mutually agreed upon by the ENGINEER and the COUNTY is <br /> as follows: <br /> Task Fee Fee <br /> Lump Sum Components Amendment 2 Total Contract <br /> Design Survey $ 40,530.00 $ 109,924.00 <br /> Roadway Design $ 29,000.00 $ 246,767.00 <br /> Signing and Pavement Marking Design $ 0.00 $ 545224.00 <br /> Traffic Signal Design $ 0.00 $ 37,825 .00 <br /> Permitting $ 0.00 $ 38,014 .00 <br /> Utility Coordination $ 0.00 $ 15,638.00 <br /> Landscape Plans $ 0.00 $ 27,850.00 <br /> Lighting Design $ 5 ,200.00 $ 17,200.00 <br /> Geotechnical Investigation $ 0.00 $ 51 , 110.00 <br /> Right of Way Maps $ 0.00 $ 84,650.00 <br /> Sub-total $ 74,730.00 $ 6835202.00 <br /> 6 <br />