Laserfiche WebLink
1 . Lighting Plans: Note, a lighting design was included in the original agreement; however, it <br /> was assumed that only relocations would be necessary. This supplement (number 2) addresses <br /> only the differences in the preparation of the design/plans due to the widening, and what was <br /> not included in the FDOT RRR project. <br /> The Lighting Plans will include the following: <br /> a. Key Sheet <br /> b. Summary of Pay Item for Estimates <br /> c. Tabulation of Quantities <br /> d. General Notices/Pay Item Notes <br /> e. Pole Data/Legend & Criteria <br /> f Service Point Details <br /> g. Project Layout <br /> h . Plan Sheets <br /> i. Special Details <br /> 2. Lighting Report/Voltage Drop Calculations <br /> A Lighting Report will be prepared and submitted, including voltage drop calculations <br /> showing the equation or equations used along with the number of luminaries per circuit, the <br /> length of each circuit, the size conductor or conductors used and their ohm resistance values. <br /> The voltage drop incurred on each circuit (total volts and percentage of drop) will be <br /> calculated. <br /> Load analysis calculations shall be submitted for each branch circuit breaker and main <br /> breaker. <br /> 3 . Coordination with Utilities <br /> The lighting design will be coordinated with the maintaining agency and any utility owners <br /> affected by the lighting project. <br /> K. Utility Design <br /> L Utility Subsurface Locates <br /> The ENGINEER will locate horizontally and vertically subsurface utilities, only for those <br /> utilities owned and operated by Indian River County, at conflicts with the proposed storm <br /> sewer facilities and proposed signalization mast arms. Additional design services will include <br /> the following tasks: <br /> 5 <br />