Laserfiche WebLink
C. Permitting — Lateral D Canal Realignment (Stanley Consultants) <br /> Include the Lateral D Canal realignment work effort in the Environmental Resources Permit <br /> to St. Johns River Water Management District. Additional services will include the following <br /> tasks: <br /> I . Update the wetland report and coordinate further with St. Johns River Water <br /> Management District. <br /> 2. Determine impacts, if any, to endangered species. Coordinate further with U. S. Fish <br /> and Wildlife Service. <br /> 3 . Perform one site review. <br /> D. Survey - Parcel right-of-wav needs associated with Lateral D Canal Realignment Area <br /> (Burdette and Associates) <br /> Provide design survey to encompass an area between the existing Sebestian River Water <br /> Control District Canal D right-of-way line and the proposed SRWCD right-of-way line due to <br /> canal re-alignment. The design services will include the following tasks: <br /> 1 . Provide design survey to encompass an area between the existing SRWCD right-of-way line <br /> and 25 feet beyond the following points describing the proposed SRWCD right-of-way line, <br /> referenced to the Baseline Survey: Station 63 +96.40, 184. 71 LT; Station 68+89 . 51 , 223 .01 <br /> LT; and Station 69+84.68, 226 .97 LT. <br /> 2. The design survey shall include locating the outer perimeter of any concrete structure, <br /> including but not limited to concrete pools, house structures and driveways that exists within <br /> the area enclosed as described above. <br /> 3 . Create legal sketches and description of the proposed right-of-way requirement from private <br /> land owner and Sebastian River Water Control District property to accommodate the canal <br /> realignment. <br /> 4. Update the electronic topography file and update the digital terrain model . <br /> 5 . Assist Geotechnical Engineer with Baseline Survey location. Stake on 200 foot intervals the <br /> Baseline Survey along CR510 and adjacent to Lateral Canal D between Station 57+00 and <br /> Station 78+00. Coordinate location of stakes with Geotechnical Engineer. <br /> E. Geotechnical — Lateral D Canal Realignment Area (GCME Inc. ) <br /> Additional geotechnical services will include the following tasks: <br /> 1 . Geotechnical soil borings along Lateral D Canal are detailed as: 10 auger borings <br /> each 20 feet deep and delineation of unsuitable soils using canal bottom probing <br /> method. <br /> 2. Geotechnical services shall include canal slope stability evaluation, roadway <br /> embankment beside canal slope evaluation, recommendation on method of slope <br /> stabilization and documentation of analysis. <br /> CR 510 Amendment 2 Page 3 of 6 6/25/2007 <br />