My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-224
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-224
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2016 11:10:36 AM
Creation date
9/30/2015 10:54:26 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
07/17/2007
Control Number
2007-224
Agenda Item Number
11.1.2
Entity Name
Stanley Consultants, Inc.
Supplemental fields
SmeadsoftID
6381
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION III - SCOPE OF SERVICES is being modified to incorporate the following: <br /> The ENGINEER agrees to perform professional roadway design and related services in connection with the <br /> project as required and set forth in the following: <br /> A . Utility Subsurface Locates (InfraMan Corp) <br /> Horizontal and vertical location of existing 16" water main and 12" force main utilities at <br /> conflicts with the proposed storm sewer pipes, storm sewer structures and proposed <br /> signalization mast arms. Design services will include the following tasks : <br /> 1 . Perform a total of 107 subsurface utility locations using air/vacuum method at the <br /> conflicts with the proposed storm sewer facilities (74 potential conflicts) and <br /> proposed signalization mast arms (estimated 33 potential conflicts: 11 mast arms and <br /> 3 holes per location) with existing subsurface utilities. The 74 locates include 30 <br /> locates for the existing 12" force main and 44 locates for the existing 16" water main. <br /> 2. Survey the horizontal and vertical location at each subsurface utility location for <br /> conflicts with the proposed storm sewer facilities and the proposed signalization mast <br /> arms. <br /> B. Drainage Design — Lateral D Canal Realignment (Stanley Consultants) <br /> Design the relocation of Lateral D Canal for approximately 1400 lineal feet using the <br /> proposed alignment and cross section of Lateral D Canal approved during the June 15, 2006 <br /> Board meeting with Sebastian River Water Control District. This Amendment does not <br /> include analyzing or designing other Canal alignment or cross section alternatives. <br /> Additional design services will include the following tasks: <br /> 1 . Design the horizontal and vertical alignment of Lateral D Canal from Station 60+00 <br /> to Station 74+00 . <br /> 2 . Create four plan/profile sheets and show plan design of Lateral D Canal at 1 "=40 ' <br /> scale. <br /> 3 . Create eight cross section sheets and show cross section design of Lateral D Canal <br /> including earthwork quantities. A vertical match line will be used to separate the <br /> CR510 alignment and the Lateral C Canal alignment. <br /> 4. Revise the three proposed pipe laterals that directly discharge to Lateral D Canal <br /> from Sebastian River Water Control District right-of-way. <br /> 5 . Design erosion protection measures (bank stabilization) on the downstream end of <br /> the 89`1 Street Canal box culvert at the confluence of Lateral D Canal. The limits of <br /> the bank stabilization will include the east side and west sides of Lateral D Canal, as <br /> well as the canal bottom. The north-south limits will extend north to Station 68+50 <br /> and south to station 70+00, for a total of 150 ' . This does not include the bank <br /> stabilization for a future 89'h Street bridge (to be designed by others) that leads to <br /> Blue Water Bay and Sebastian Lakeview Estates PUD 's. <br /> CR 510 Amendment 2 Page 2 of 6 6/25/2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.