My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-305
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-305
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2016 12:24:25 PM
Creation date
9/30/2015 9:05:55 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Second Amendment
Approved Date
09/13/2005
Control Number
2005-305
Agenda Item Number
7.G.
Entity Name
Donadio & Associates
Subject
Emergency Operations Center Services Agreement
Area
43rd Ave.
Supplemental fields
SmeadsoftID
5158
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
All components and cladding assemblies necessary to maintain a structurally enclosed condition and prevent <br /> rainwhter intrusion shall be designed to meet the wind design criteria . Roof cover waterproofing barriers shall <br /> meet the wind design criteria . Loose aggregate roof ballast shall not be used on the roof cover. Rooftop <br /> equipment shall be designed and installed to meet the wind design criteria . <br /> C . The EOC and essential ancillary structures and equipment shall resist penetration by windborne debris impact <br /> At a minimum, all exterior enclosure claddings and assemblies (i . e . , walls , roofs , louvers , outside <br />doors , <br /> windows, etc . ) located within 60 feet in height above finish grade shall meet the hurricane windborne debris <br /> impact criteria specified in the Department of Energy's (DOE) Standard, Natural Phenomena Hazards Design <br /> and Evaluation Criteria, DOE-STD - 1020-2002 . That is , the building enclosure must resist penetration by a <br /> nominal 2 " x4 " lumber plank weighing 15 pounds propelled at 50 miles per hour striking end-on and normal to <br /> the assembly surface . As applicable, impact test procedures shall be consistent with recognized state and <br /> national standards ; such as , SBCCI Test Standard for Determining Impact Resistance from Windborne Debris <br /> SSTD 12 , American Society of Testing and Materials (ASTM) Standards ASTM E 1886 and ASTM E 1996, and <br /> Florida Building Code Testing Protocols TAS 201 , TAS 202 and TAS 203 . <br /> D . The minimum design elevation of the lowest floor for the EOC and essential ancillary structures <br /> and <br /> equipment shall be located outside of or elevated above : Category 5 storm surge elevation, the 500 year flood <br /> plain (if determined) , or the base flood elevation plus two feet, whichever is greater. <br /> E . The following information shall be shown on the construction drawings : 1 . wind design per ASCE 7 with <br /> applicable year of revision, 2 . design wind speed, 3 . wind importance factor, 4 . design wind exposure, 5 . design <br /> internal pressure coefficient, 6 . design wind pressures in terms of pounds per square foot (psf) to be used for the <br /> design of exterior component and cladding materials not specifically designed by the principal licensed design <br /> professional , 7 . windborne debris impact performance criteria, and 8 . finish floor elevation with comparison <br /> reference to the Category 5 storm surge elevation, 500 year flood elevation (if determined) , and the base flood <br /> elevation . <br /> F . The EOC and essential ancillary structures and equipment shall be designed for a minimum of 72 hours of <br /> continuous operation and shall not be solely reliant upon off-site utilities (e . g. , water, natural <br /> gas fuel , <br /> electricity, telecommunication and information technologies, etc . ) The design shall ensure that the EOC is <br /> equipped with survivable communications to receive and distribute warnings , and ensure connectivity with other <br /> EOGs , the State Warning Point, adjacent jurisdictions , and key response and recovery agencies and <br /> organizations . <br /> G . Force protection and security measures shall be consistent with the guidance published in Florida's Homeland <br /> Security Comprehensive Assessment Model(HLSCAM), United States Air Force Installation Force Protection <br /> Guide, or other federal or state recognized best-practices guides as approved by the Department . <br /> Authorization <br /> Authorization is granted to proceed with Additional Services as described herein and in accordance with <br /> approvals given at a regular meeting of the Indian River County Board of County Commissioners on Tuesday, <br /> August 2 , 2005 . <br /> The following adjustment shall be made to compensation . <br /> Compensation: <br /> Add : $375,700. 00 (Three Hundred Seventy-Five Thousand, Seven Hundred Dollars and No Cents) <br /> Reimbursables shall not exceed $ 30 , 000 . 00 <br /> Time : of design services : 10 (ten) months; to run concurrently with and independently of the Primary Contract. <br /> Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.