My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-447
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-447
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2016 2:23:00 PM
Creation date
9/30/2015 11:34:01 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Second Amendment
Approved Date
12/18/2007
Control Number
2007-447
Agenda Item Number
11.J.1
Entity Name
Post, Buckley, Schuh & Jernigan
Subject
Amendment No.2 to Work Order No.2 Installation Production Wells
Area
North Water Treatment Facility
Supplemental fields
SmeadsoftID
6768
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 3. 1 - Construction Plans — General Location and RW Piping <br /> PBS&J will prepare construction plan sheets for the addition of the three new wells showing well <br /> locations, raw water piping and connections to existing well piping to the plants, and new access <br /> easements and/or roadways to the new wells. <br /> Task 3.2 - Construction Plans — Well Enclosures <br /> PBS &J will prepare construction plan sheets for the new enclosures around the three new wells. <br /> Enclosures will be concrete block construction with seamless metal roofs. Enclosures will house the <br /> entire well head assembly up to and including the flow meter and all control valves. Access to the <br /> pump and motor will be through an overhead door on the side of the enclosure and through a roof- <br /> mounted access hatch. Electrical power and control systems will be located inside each enclosure. <br /> These plans will rely significantly on the existing design being completed for the current three wells. <br /> Task 3.3 - Construction Plans — Mechanical Piping <br /> PBS&J will prepare construction plan sheets for the installation of the well pump, motor, piping, <br /> valves, and fittings. Design will be similar to existing wells, providing an automatic means to <br /> blowoff initial well volumes, allow air to escape during well start, and allow vacuum to be relieved <br /> during well shutdown. Well head piping will be above ground and include a flow meter for each <br /> well . These plans will rely significantly on the existing design being completed for the current three <br /> wells . <br /> Task 3.4 - Construction Plans — Electrical and Instrumentation <br /> PBS&J will prepare construction plan sheets for providing electrical power to each new well site and <br /> allow remote control and operation of the new wells from its associated treatment plant. Power is <br /> expected to be separately supplied and metered to each site . Emergency power for well 8 will be <br /> delivered from the North Water Plant. Emergency power to wells 7 and 9 will be through plug-in <br /> receptacles from portable generation equipment already owned by the County. Control will be <br /> through additions to the plants ' existing telemetry system. Control specifications will include <br /> software modifications to the plant control system. These plans will rely significantly on the existing <br /> design being completed for the current three wells . <br /> Task 3.5 - Specifications <br /> PBS&J will prepare technical specifications related to the project and will incorporate County <br /> standard "front-end" (Division 0- 1 ) specifications. These specifications will rely significantly on the <br /> existing design being completed for the current three wells. <br /> Task 3 .6 - Cost Estimating <br /> PBS&J will prepare estimates of probable construction cost to be submitted with the 60%, 90% and <br /> bid documents . <br /> Task 3.7 - County Reviews <br /> PBS&J will submit up to 5 sets of progress contract documents at approximately the 60% and 90% <br /> levels of completion. PBS&J will attend a single review meeting with IRC staff for each progress <br /> CAF%wix �Envitonntemal INDIAN_RIV CR_COU RC W WW20UC"002_CURWells'dll_Propwals\IA_PioNsalsJ new wells SOMAltachment 111260].doc <br /> L st Revised 11262007 1 28 PM <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.