My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-447
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-447
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2016 2:23:00 PM
Creation date
9/30/2015 11:34:01 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Second Amendment
Approved Date
12/18/2007
Control Number
2007-447
Agenda Item Number
11.J.1
Entity Name
Post, Buckley, Schuh & Jernigan
Subject
Amendment No.2 to Work Order No.2 Installation Production Wells
Area
North Water Treatment Facility
Supplemental fields
SmeadsoftID
6768
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
milestone. IRC staff will provide PBS&J a single set of written review comments prior to each <br /> review meeting. <br /> Task 4 - Geotechnical Evaluation <br /> The scope of the work will include drilling Standard Penetration Test (SPT) borings in general <br /> accordance with ASTtUI D 1586 with one boring for each new well site. A geotechnical report will be <br /> developed to make recommendations for design of the new enclosures . <br /> Task 5 - Permitting <br /> PBS&J will prepare and submit construction permit applications for the North WTF' s addition of the <br /> new wells . PBS&J will respond to up to one request for additional information. <br /> PBS&J will prepare one permit application on behalf of IRC staff for a County building permit for <br /> the additional well enclosures. PBS&J will respond to up to one request for additional information. <br /> Task 6 - Bidding Phase Services for Well Outfitting and Piping <br /> Task 6. 1 - Document Distribution and Pre-Bid Meeting <br /> PBS&J will make up to thirty (30) copies of the final bid documents and deliver same to IRC staff for <br /> County use and as requested from bidders. IRC staff will distribute these documents to bidders. <br /> PBS&J will attend the pre-bid conference to assist IRC staff in answering potential bidder questions. <br /> Task 6.2 - Addenda Preparation <br /> It has been assumed that the bidding period (from issuance of invitation for bid to bid opening) will <br /> be thirty (30) calendar days. During the bidding period, PBS &J will receive bidders ' written <br /> questions from IRC staff, and prepare an addendum for distribution by IRC staff. For the purposes of <br /> budgeting this task, one addendum is assumed to be required. <br /> Task 7 - Construction Services for Well Outfitting and Piping <br /> Once authorized by IRC staff, PBS&J will proceed with the construction phase services described <br /> below by specific tasks. It is anticipated that the construction period will not exceed 8 months. <br /> The County will provide on-site observation services during construction and PBS&J is entitled to <br /> rely on such services without their own independent review. <br /> PBS &J shall not be responsible for construction means, methods, techniques, sequences or <br /> procedures, or for safety precautions and programs in connection with the work, and shall not be <br /> responsible for the County or Contractor(s) failure to carry out the work in accordance with the Plans <br /> and Specifications . <br /> Task 7. 1 - Construction Administration <br /> PBS&J will participate in construction administration activities such as telephone conversations, <br /> communication with key project personnel, etc ., up to the budget limit of 60 hours. <br /> CAF/bw,'Xv.EmimnmentaHNDI AS_R IV ER_Ca1RC W W\V2C04A 1V002_CUP-We]Ls101_Pmpasals'JA,Pcoposals'd new wells SOWAuachment l IiZbO.doc <br /> Lon Revered I1!20/2U07 128 PM <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.