My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-410
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-410
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2016 4:21:06 PM
Creation date
9/30/2015 10:23:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
12/05/2006
Control Number
2006-410
Agenda Item Number
11.J.1.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Utilities Relocation - Wabasso River-Amendment No.2/Work Order No.4
Supplemental fields
SmeadsoftID
5978
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 1 <br /> To <br /> Amendment 2 <br /> To <br /> Work Order Number 4 <br /> Project Description and Understandin¢ <br /> This Amendment Number 2 modifies the scope of work in Work Order 94 and Amendment Number I to <br /> Work Order #4 for additional design and permitting for the Horizontal Directional Drill (HDD) <br /> installation of the Sub-Aqueous Utility Relocations, crossing the Wabasso River. The following scope of <br /> services consists of revising the plans to make the previously designed reclaimed (IQM or reuse) <br /> watermain into the presently proposed forcemain crossing of the Wabasso Causeway (CR510) from the <br /> mainland to the barrier island, and to design new watermain segments between the previously design <br /> HDD installations . The existing 12-inch forcemain and 12-inch watermain will be taken out of service, <br /> and used as a reclaimed watermain in the future. A new general permit for this forcemain construction is <br /> required for this proposed change to the original plan. <br /> SCOPE OF SERVICES <br /> The Scope of Services for Amendment #2 to Work Order 44 consists of the following : <br /> Task 1 .0 — Meetings and Project Permit Coordination <br /> No change to the previously approved Work Order for this task. This task is complete. <br /> Task 2.0 — Collection of Existing Data <br /> No change to the previously approved original Work Order for this task. This task is complete. <br /> Task 3.0 — Field Survey, Geotechnical Exploration, and Environmental Data Collection <br /> No change to the previously approved Work Order and Amendment one for this task. This task is <br /> complete. <br /> The consultant will provide Additional Survey that is required in the vicinity of the Marsh island entrance <br /> to locate the existing watermain and forcemain, which was not included in the original scope of this <br /> project. This area includes an environmentally sensitive area that will be located and shown on the survey <br /> to design the project for the construction to avoid this area, as the existing permit application described <br /> that all construction would occur in upland areas. The Consultant will provide Environmental Resource <br /> Permitting services in this area if necessary, as Additional Services. <br /> Task 4.0 — Design <br /> The previously approved Work Order and Amendment one for this task is complete, and is amended as <br /> follows . <br /> The Consultant will revise the reuse design plans to make the pipe on the south side on the causeway the <br /> proposed forcemain pipe, and design new watermain segments between the previously designed HDD <br /> installations. This will allow the conversion of the existing watermain and the existing forcemain into the <br /> IQM transmission piping that crosses the Indian River along the CR 510 causeway. Revisions to the <br /> plans consist of adding an additional design sheet, revising the design sheets to show the entire length of <br /> the causeway, to show tie-ins at each end of the project, designing tie-ins for the existing branches on the <br /> forcemain at Marsh Island, Wabasso Island Road, and the Indian River County Boat Ramp facility near <br /> H: %04457200'PNeopeMabasso HDD Proposal-Amendment 2 rev3. doe <br /> 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.