My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-311
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-311
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2016 3:50:06 PM
Creation date
9/30/2015 10:01:32 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
09/12/2006
Control Number
2006-311
Agenda Item Number
11.J.4.
Entity Name
Ecotech Consultants, Inc.
Subject
North County Brine Disposal-Amendment No.2-Work Order No.1
Supplemental fields
SmeadsoftID
5816
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 1 <br /> ATTACHMENT <br /> INDIAN RIVER UTILITIES DEPARTMENT <br /> NORTH COUNTY BRINE DISPOSAL <br /> SCOPE OF SERVICES <br /> Amendment No . 2 modifies the scope of work in Work Order No . 1 as issued to Ecotech <br /> Consultants, Inc. for assisting the County with responding to request for additional information <br /> (RAI) received from the Florida Department of Environmental Protection (FDEP), meetings with <br /> FDEP in Tallahassee, and the preparation of a mitigation plan for the Spoonbill Marsh using a <br /> portion of the Lost Tree Islands property. <br /> Amendment No. 2 is being implemented at this time to provide professional environmental and <br /> engineering services by Ecotech Consultants, Inc . and Masteller & Moler, Inc . associated with the <br /> project described above. The additional work to be performed as part of this Amendment will <br /> generally included preparation of responses to RAI questions, meetings with FDEP, and the <br /> preparation of mitigation plans . <br /> A brief description of the scope of services for Amendment No . 2 is provided below : <br /> Task 1 . FDEP Tallahassee Presentation <br /> Ecotech Consultants, Inc . (ETC) will prepare a power point presentation outlining the design and <br /> design rationale for the project. ETC will meet with Mr. Mike Sole and the administrative staff of <br /> the technical departments within the Tallahassee FDEP office. <br /> The deliverables for this task will include a summary memo outlining the discussion with FDEP . <br /> Task 2 . Investigate ERP Optional Design <br /> ETC will meet with the FDEP UMAM and ERP staff on the project site to discuss the environmental <br /> aspects of the project, especially as they relate to mitigation. ETC will, with prior concurrence by <br /> the County, modify the Industrial Waste Permit (IWP) to reflect the changes agreed to by FDEP <br /> based on the on-site meeting. <br /> Page 1 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.