My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-310
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-310
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2016 3:49:16 PM
Creation date
9/30/2015 10:01:27 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT A <br /> the final drawings for the Site Plan Permit and for the inclusion in the contract <br /> documents . Site civil drawings will be modified to show the new fencing, grading, and <br /> landscape buffers prior to bidding. <br /> Task 4.0 Bidding Assistance Services <br /> Additional bidding services are anticipated for additional preparation of addenda given the <br /> complicated nature of the plant and the possibility of only expanding a portion of the plant. The <br /> additional bidding services also is for conforming the construction documents to the <br /> components actually contracted in the final award of contract. <br /> Task 5.0 Contract AdministratiOnmeriodic Field Representation <br /> (No change in this Amendment) <br /> OTHER SERVICES NOT INCLUDED IN THIS SCOPE OF SERVICES (No Changes) <br /> The following list of items is not included in this Scope of Services but will be addressed in <br /> separate proposals or will be negotiated separately with IRC, if required : <br /> A . Excavation for field verification of the actual locations of existing underground utilities <br /> and structures. If field verification is necessary, excavation shall be provided by IRC as <br /> directed by CDM . <br /> B. Services associated with assisting IRC in the review and evaluation of patent-related <br /> disputes, issues, or claims including preparing to serve or serving as a consultant or <br /> witness for IRC in litigation, arbitration, public or private hearings, or other legal or <br /> administrative proceedings involving patent-related disputes, issues, or claims. <br /> C. SJRWMD Consumptive Use and FDEP Well Construction permitting and well system <br /> and raw water piping outside of the plant fence/ offsite design, bidding, and <br /> construction are to be conducted by others . <br /> D. Concentrate disposal relocation permitting is currently underway by others. Services for <br /> concentrate disposal permitting will be contract amendment, if required. <br /> E. Special services associated with construction including operating manuals and start-up <br /> services. <br /> F. Start-up Instrumentation Programming services <br /> G. Additional services in connection with the project not otherwise provided for in this <br /> Scope of Services. <br /> COUNTY RESPONSIBILITIES <br /> IRC shall provide the following to CDM in a timely manner: <br /> ■ Fees for permits <br /> ■ Review of CDM work products <br /> ■ Standard Front-End (Division 0) Contract Documents <br /> A-4 mhzszs eoc <br />
The URL can be used to link to this page
Your browser does not support the video tag.