Laserfiche WebLink
Indian River County Turner <br /> • ° Emergency Operations Center <br /> F<ONIp!• <br /> GMP Summary <br /> Qualifications & Assumptions <br /> Report Date: 26 May 06 <br /> The GMP for the Indian River County Emergency Operations Center is based on the <br /> Documents as listed herein and as modified / clarified through the following Qualifications <br /> and Assumptions . In the event of any conflicts between these Qualifications and <br /> Assumptions and any other Contract Documents , these Qualifications and Assumptions <br /> shall govern . <br /> L GENERAL <br /> 1 We have assumed that the Cost of the following items are to be paid by the Owner and <br /> are not included in our GMP . <br /> Impact fees , special assessment fees <br /> Threshold Inspector <br /> Cost of Building Permits , Plan Review Fees , and related expenses <br /> Material Testing and Inspection <br /> Unforeseen Subsurface Conditions <br /> Utility Company charges and/or fees except for standard monthly power or water bills <br /> during construction prior to substantial completion . <br /> Design or consulting costs <br /> Survey of existing project site <br /> Kitchen Equipment <br /> Artwork <br /> Furnishings <br /> Security system wiring and devices . <br /> Telephone/data wiring and devices . <br /> 2 The GMP is based on standard manufacturer's warranties as available in the industry at <br /> the time of purchase . <br /> 3 The GMP is based on a 11 . 0 month construction schedule from the receipt of all permits <br /> and the notice to proceed to Substantial Completion , plus 2 months of close-out. <br /> 4 Turner assumes that the Owner will secure any air rights from adjacent property Owners <br /> and permits with regard to the concrete pumps , cranes , and crane booms . <br /> 5 The GMP is based on drawings provided by Donadio and Associates which we assume <br /> have been designed in accordance with the current Florida Building Code . Any cost <br /> resulting from changes in Building Codes may result in a change to the GMP . <br /> 6 The GMP includes Subcontractor Default Insurance at 1 . 3% of the direct cost of the work, <br /> in lieu of bonds furnished from subcontractors . Typical subcontractor bonding rates are <br /> between 1 . 5% to 2% . <br /> 7 The following GMP costs will be billed in full in our first application for payment. The value <br /> of these items is based on the GMP amount. <br /> a . General Liability & Worker's Compensation Insurance <br /> Page 1 <br />