My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-299
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-299
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2016 11:53:04 AM
Creation date
9/30/2015 11:07:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
09/04/2007
Control Number
2007-299
Agenda Item Number
14.B.3
Entity Name
Geosyntec Consultants, Inc.
Subject
Amendment to Work Order No.4 Services Landfill Lateral Expansion
Area
County Landfill Fafility
Supplemental fields
SmeadsoftID
6544
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu H. Mehta, P.E. <br /> 11 July 2007 <br /> Page 5 <br /> • the potential presence of muck, previously filled areas, soft ground, lineaments, and <br /> sinkholes; <br /> • potential fault areas, seismic impact zones, and unstable areas; <br /> • estimates of average and maximum high ground water table across the site; and <br /> • foundation analysis to evaluate the ability of the foundation to support the loads and <br /> stresses imposed by the proposed landfill expansion including the infills contemplated for <br /> future expansion. <br /> This report will be prepared as a component of the substantial modification permit application <br /> for the Class I — Segment 3 landfill lateral application, as required by Rule 62-701 .330(3)(f), <br /> FAC. The report will be prepared and certified by a qualified geologist or engineer registered in <br /> the State of Florida. <br /> Task 3 — Design and Permit Application <br /> Geosyntee will design and prepare the substantial modification permit application for submittal <br /> to FDEP for the Class I — Segment 3 landfill lateral expansion of the IRCL. The design will <br /> include the engineering analyses to demonstrate that the landfill lateral expansion complies with <br /> the specific requirements of Rule 62-701 .400, FAC. The following activities will be performed <br /> to design the landfill expansion and prepare the permit application: <br /> • review existing permit application and other relevant reports and documents; <br /> • prepare conceptual plan for landfill development through end-of-life of the facility based <br /> on the initial site development plan prepared by other consultants; <br /> • meet with FDEP to discuss the proposed lateral expansion, including the design and <br /> permitting approach (this will be performed as part of Task 1 ); <br /> • prepare detailed phasing plans for the landfill expansion including plans for liner system, <br /> final cover system, and waste fill sequencing; <br /> • evaluate available storage volume and approximate timeline for landfill development; <br /> • design the leachate management system for the expansion area, including collection, <br /> transmission, and disposal of leachate into the nearby county sewer system; <br /> XL0609&Amendment to Class l landfill Design Work Order.doc <br /> engineers I scientists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.