My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-299
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-299
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2016 11:53:04 AM
Creation date
9/30/2015 11:07:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
09/04/2007
Control Number
2007-299
Agenda Item Number
14.B.3
Entity Name
Geosyntec Consultants, Inc.
Subject
Amendment to Work Order No.4 Services Landfill Lateral Expansion
Area
County Landfill Fafility
Supplemental fields
SmeadsoftID
6544
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu H. Mehta, P.E. <br /> 11 July 2007 <br /> Page 6 <br /> • design the top elevation and final cover configuration for the proposed expansion to meet <br /> the disposal capacity needs of IRC; <br /> • perform hydrologic and hydraulic analysis for extreme rainfall events and design the <br /> surface-water management system for the expansion area, including control features to <br /> separate surface water from leachate during construction and operation of the expansion <br /> area; <br /> • perform slope stability (liner system, interim and final configurations, and veneer <br /> stability of the final cover system) and settlement evaluations for the proposed expansion <br /> and the infill planned for future construction; <br /> • design the gas control and collection system (GCCS) for the proposed expansion; <br /> • prepare permit drawings (with adequate details for permitting) for the proposed <br /> expansion of the landfill (approximately 20 sheets of D-size, 24 inches by 36 inches); <br /> • prepare Technical Specifications and a Construction Quality Assurance (CQA) Plan for <br /> all components of construction for the landfill expansion; <br /> • revise the facility operating plans (Operations Plan, Leachate Management Plan, Gas <br /> Management Plan, Water-Quality Monitoring Plan, and Closure Plan) to incorporate <br /> changes, as needed, from the proposed expansion; <br /> • prepare financial assurance cost estimate for closure and long-term care of the proposed <br /> expansion; and <br /> • complete the required FDEP form (62-701 .900( 1 )) and prepare the supporting plans and <br /> engineering reports. <br /> Geosyntec will prepare the substantial modification permit application for the Class I — Segment <br /> 3 Landfill (Permit Application) for the 33-acre lateral expansion. The Permit Application will <br /> include the engineering reports, permit drawings and operating plans required in accordance with <br /> Chapter 62-701 , FAC. The Permit Application will be signed and sealed by a registered <br /> professional engineer in the State of Florida. <br /> Geosyntec will provide four complete copies of the amended Permit Application to FDEP and <br /> two copies to SWDD. An electronic file of the Permit Application will also be provided to <br /> FDEP and SWDD. <br /> Xr.06096Wmendmem to Class I landfill Design Work Order.doc <br /> engineers I Scientists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.