Reef Project Technical and Environmental Specifications . The ATM engineer <br /> shall also provide a cursory inspection of construction materials present while on <br /> site , shall assess the results of the drop tests and advise the contractor as to the <br /> suitably of the material ; <br /> • Provide clarification and interpretations of the Contract Documents when needed <br /> (and while on - site ) ; <br /> • Review the loading and deployment of reef material for compliance with the <br /> permit and the contract ; and , <br /> • Document observations coincident with field inspections . <br /> The Supplemental Task 2 services to be performed by ATM shall consist of construction <br /> administration support , including periodic (weekly during construction ) site inspections <br /> during the construction phase of the project . It is explicitly understood that the COUNTY <br /> staff shall furnish daily supervision and inspection of the project , and County staff will <br /> interact directly with the CONTRACTOR as the owner of the Mitigation Reef project . <br /> During the periodic site inspections , ATM will : <br /> • Visit the site on an approximate weekly basis , depending on the progress of <br /> construction . Observations will be conducted to ensure that construction is in <br /> compliance with the construction plans , contract documents , and permit <br /> authorizations granted for the work . The Engineer will be on call throughout the <br /> period of construction . <br /> • Review the contractor' s quality control reports (daily reports) through the duration <br /> of the project from mobilization ( initial deployment) through demobilization from <br /> the project site . The Engineer shall attend periodic progress meetings with the <br /> Contractor and the Contractor' s associated sub-contractors as appropriate during <br /> construction . <br /> • Review and make a volumetric comparison of Contractor progress and pay <br /> surveys , quarry records , weigh slips or draft tables , and pay requests for all work <br /> elements . The Engineer shall carefully review for accuracy of computation and <br /> completeness the Contractor' s periodic payment invoices and will make <br /> recommendations to the Owner/Permittee . <br /> • Revise design sections as necessary during the course of the work in order to <br /> maintain the integrity of the project dimensions and the contract cost . Revised <br /> plan sheets and/or Change Orders will be formulated on an as- needed basis by <br /> the Consultant with the consent of the Owner ; and , <br /> • Supervise additional drop tests as needed due to the change in the Contractor' s <br /> proposed plan for obtaining the m aterial from a single quarry . It is necessary to <br /> inspect material from each quarry , performing drop tests before the material is <br /> approved for use and at 10 , 000 ton intervals as specified in the Indian River <br /> County Mitigation Reef Project Technical and Environmental Specifications . <br /> During this inspection , the ATM engineer shall also provide a cursory inspection <br /> of construction materials , shall assess the results of the drop tests and advise the <br /> contractor as to the suitably of the material . <br /> HAjobs\03-719 IRC Post-Constr Services\Amendment 8\Scope of Work.doc 2 <br />