Laserfiche WebLink
TASK 3 : PRODUCTION OF AS - BUILT DRAWINGS <br /> Task 3 of Contract Amendment #7 included development of As - Built drawings based on <br /> the post-construction survey , consisting of updated construction drawings showing the <br /> post- construction survey of the mitigation reef. As- Built drawings will be furnished as <br /> two (2 ) hard copies ( 24 "x36 " ) to the COUNTY and one hard copy to the FDEP Bureau of <br /> Beaches and Coastal Systems . <br /> The contracted fee for this task was developed in error , reflecting the level of effort <br /> required for developing As- Built drawings for a beach nourishment project involving a <br /> great deal of data . Thus , the fees contracted for this task exceed the level of effort <br /> expected for the development of As- Built drawings for the mitigation reef. <br /> Fees for Task 3 shall be reduced by $ 8 , 600 . 00 <br /> TASK 4 : SUBSTANTIAL COMPLETION AND FINAL INSPECTION <br /> Task 4 of Contract Amendment #7 includes inspection and issuance of a certificate of <br /> substantial completion , development of a punch - list , and final inspection by ATM and <br /> review of data and any other pertinent contractor-supplied documents and <br /> recommendation to the COUNTY to provide final payment to the CONTRACTOR . <br /> For additional clarification , these services include : <br /> Submittal of a written statement of completion and certification by a registered <br /> professional engineer to the Owner/Permittee and the Department within 30 days after <br /> completion of construction . This certification shall state that all locations and elevations <br /> specified by the permit have been verified ; the activities authorized by the permit have <br /> been performed in compliance with the plans and specifications approved as a part of <br /> the permit , and all conditions of the permit ; or shall describe any deviations from the <br /> plans and specifications , and all conditions of the permit . <br /> For all inspection activities , direct inspection by ATM is limited to above- water efforts . <br /> ATM review of the constructed mitigation structures will be limited to review of <br /> information , including photographs , video images , and bathymetric data , provided by the <br /> CONTRACTOR , the COUNTY , and others that the COUNTY chooses to employ to <br /> make such observations . If necessary , ATM will assist the COUNTY with contacting one <br /> or more firms that may assist with the underwater activities . <br /> The fee for this task is unchanged from the fee approved in Contract Amendment 7 . <br /> TASK 6 : PRE -TURTLE NESTING SEASON YEAR 2004 2005 AND 2006 BEACH <br /> TILLING AND LEVELING <br /> For clarification , Task 6 of Contract Amendment #7 includes fees for 2004 , 2005 , and <br /> 2006 beach tilling and escarpment leveling . <br /> The fee for this task is unchanged from the fee approved in Contract Amendment 7 . <br /> Rl obs\03-719 IRC Post-Constr ServicesWmendment 8\Scope of Work.doc <br /> 3 <br />