INDIAN RIVER COUNTY MITIGATION REEF PROJECT <br /> TECHNICAL AND ENVIRONMENTAL SPECIFICATIONS <br /> schedule shall show the various activities of work in sufficient detail to demonstrate that <br /> the CONTRACTOR has a reasonable and workable plan to complete the project within <br /> the contract period . The schedule shall show the order and interdependence of activities <br /> and the sequence in which the work is to be accomplished as planned by the <br /> CONTRACTOR. All activities shall be described so that the work is readily identifiable <br /> and the progress on each activity can be readily measured . Each activity shall show a <br /> beginning work date and the work duration . Activities shall include procurement time for <br /> materials and equipment, where they are appropriate and essential to the timely <br /> completion of the project. The list of activities shall include milestones , when required by <br /> the Plans or the Contract Documents , The Gantt chart shall also identify the beginning <br /> and end of Marine Turtle Nesting Season . <br /> The schedule will be reviewed by the COUNTY prior to the start of construction and will <br /> become part of the Contract Documents . If the schedule submitted is determined to be <br /> inadequate by the COUNTY, it will be returned to the CONTRACTOR for correction . <br /> The CONTRACTOR shall have five (5 ) calendar days from the date of transmittal of the <br /> document to the CONTRACTOR by the COUNTY to submit a corrected schedule . When <br /> accepted , this schedule will constitute the baseline against which progress will be <br /> measured . <br /> The CONTRACTOR shall submit an updated Work Progress Schedule when requested <br /> by the COUNTY. If revisions are required to the working schedule , the CONTRACTOR <br /> shall furnish revised bar graphs (Gantt Chart) and schedule within five (5 ) calendar days <br /> subsequent to notification by the COUNTY. <br /> Failure to finalize either the initial or a revised Work Progress Schedule in the time <br /> specified will result in the withholding of all contract payments until the Work Progress <br /> Schedule is accepted by the COUNTY. <br /> 12 . MATERIALS REQUIRED <br /> Two types of mitigation reef shall be constructed ; High Relief High Complexity (HRHC ) <br /> (Section 17 . 11 ) and Low Relief Low Complexity ( LRLC) (Section 17 . 12 ) . Materials to <br /> construct the High Relief High Complexity ( HRHC ) and the Low Relief Low Complexity <br /> ( LRLC ) reef shall consist of limestone or coquina boulders as shown in the Plans . <br /> Material should be inspected prior to loading onto trucks or work barges and should be <br /> clean , free of excessive soil , plant material , steel , or other pollutants or protruding <br /> material . If washing of material is necessary to remove excess debris from the limestone <br /> or coquina boulders , washing of material shall occur prior to material loading onto trucks <br /> for initial weighing . As needed , additional washing at the staging area shall take place <br /> prior to loading onto barges to ensure clean material . CONTRACTOR shall be <br /> responsible for retaining all wash water on -site per Section 19 . 5 . 1 . <br /> 12 . 1 Contract Material . All material shall consist of limestone or coquina boulders <br /> comprised of natural limestone or coquina . Material shall be hard , dense , and durable , <br /> and within specified limits of size . Material shall have a minimum unit weight of 135 <br /> Ibs/ft3. All material shall be roughly angular, free of cracks , soft seams , and other <br /> TS-6 <br />