INDIAN RIVER COUNTY MITIGATION REEF PROJECT <br /> TECHNICAL AND ENVIRONMENTAL SPECIFICATIONS <br /> name and phone number of the Subcontractor's agent . The required forms <br /> referenced in Section 8 of these Technical and Environmental Specifications <br /> shall be prepared and submitted with the bid . The use of any Subcontractors <br /> must be approved by the COUNTY prior to the start of work by the <br /> Subcontractor. <br /> 10 .2 Quality Assurance (QA) Plan . The CONTRACTOR shall prepare a QA Plan <br /> designating a QA Officer and including , but not limited to , all QA activities specified in <br /> Section 24 of these Technical and Environmental Specifications . <br /> 10 . 3 Safety Plan . The Safety Plan shall include , but not be limited to , all of <br /> the <br /> requirements specified in Section 25 of these Technical and Environmental <br /> Specifications . <br /> 10 .4 Accident Prevention Plan , The Accident Prevention Plan shall include , but not be <br /> limited to , all of the requirements specified in Section 25 of these Technical and <br /> Environmental Specifications , <br /> 10 . 5 Worker's Compensation Coverage Affidavit. The CONTRACTOR shall submit <br /> an affidavit of worker's compensation coverage as specified in Section 29 . 1 of these <br /> Technical and Environmental Specifications , <br /> 10 . 6 U .S . Coast Guard Certifications . The CONTRACTOR shall obtain any and all <br /> U . S . Coast Guard certifications and/or approvals . Copies of all required U . S . Coast <br /> Guard certifications or approvals must be provided to the COUNTY at the Pre- <br /> Construction Meeting , <br /> 10 . 7 Environmental Protection Plan . The Environmental Plan shall include , but not be <br /> limited to , all of the requirements specified in Section 19 of these Technical and <br /> Environmental Specifications . <br /> 10 . 8 Vessel Operations Plan . The CONTRACTOR shall furnish a Vessel Operations <br /> Plan that details protocols and procedures for all water-based vessels , both motorized <br /> and non-powered , at the staging , transiting and work areas . This Plan shall also <br /> reference procedural means to be followed should mitigative reef materials become <br /> inadvertently displaced from the barge or vessel work surface prior to proper deployment <br /> in the Mitigation Area , should the crew encounter severe weather requiring anchoring of <br /> vessel (s ) in or near the Mitigation Area or adjacent nearshore waters , and intended <br /> procedures to be followed in the event that endangered species are noted in the Staging <br /> or Mitigation Areas . <br /> 10 . 9 Other Items as may be specified elsewhere in these Contract Documents . <br /> 11 . WORK PROGRESS SCHEDULE <br /> The Work Progress Schedule shall be in the form of a bar graph (Gantt Chart) showing <br /> the time allotted for each of the various work activities and the cumulative project . The <br /> TS-5 <br />