My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-018B
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-018B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 1:57:48 PM
Creation date
9/30/2015 7:16:51 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/20/2004
Control Number
2004-018B
Agenda Item Number
11.I.2
Entity Name
Applied Technology & Management
Subject
Contract Specifications
Mitigation Reef Design
Area
Ambersand Beach Sectors 1 & 2
Bid Number
6031
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3595
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY MITIGATION REEF PROJECT <br /> TECHNICAL AND ENVIRONMENTAL SPECIFICATIONS <br /> name and phone number of the Subcontractor's agent . The required forms <br /> referenced in Section 8 of these Technical and Environmental Specifications <br /> shall be prepared and submitted with the bid . The use of any Subcontractors <br /> must be approved by the COUNTY prior to the start of work by the <br /> Subcontractor. <br /> 10 .2 Quality Assurance (QA) Plan . The CONTRACTOR shall prepare a QA Plan <br /> designating a QA Officer and including , but not limited to , all QA activities specified in <br /> Section 24 of these Technical and Environmental Specifications . <br /> 10 . 3 Safety Plan . The Safety Plan shall include , but not be limited to , all of <br /> the <br /> requirements specified in Section 25 of these Technical and Environmental <br /> Specifications . <br /> 10 .4 Accident Prevention Plan , The Accident Prevention Plan shall include , but not be <br /> limited to , all of the requirements specified in Section 25 of these Technical and <br /> Environmental Specifications , <br /> 10 . 5 Worker's Compensation Coverage Affidavit. The CONTRACTOR shall submit <br /> an affidavit of worker's compensation coverage as specified in Section 29 . 1 of these <br /> Technical and Environmental Specifications , <br /> 10 . 6 U .S . Coast Guard Certifications . The CONTRACTOR shall obtain any and all <br /> U . S . Coast Guard certifications and/or approvals . Copies of all required U . S . Coast <br /> Guard certifications or approvals must be provided to the COUNTY at the Pre- <br /> Construction Meeting , <br /> 10 . 7 Environmental Protection Plan . The Environmental Plan shall include , but not be <br /> limited to , all of the requirements specified in Section 19 of these Technical and <br /> Environmental Specifications . <br /> 10 . 8 Vessel Operations Plan . The CONTRACTOR shall furnish a Vessel Operations <br /> Plan that details protocols and procedures for all water-based vessels , both motorized <br /> and non-powered , at the staging , transiting and work areas . This Plan shall also <br /> reference procedural means to be followed should mitigative reef materials become <br /> inadvertently displaced from the barge or vessel work surface prior to proper deployment <br /> in the Mitigation Area , should the crew encounter severe weather requiring anchoring of <br /> vessel (s ) in or near the Mitigation Area or adjacent nearshore waters , and intended <br /> procedures to be followed in the event that endangered species are noted in the Staging <br /> or Mitigation Areas . <br /> 10 . 9 Other Items as may be specified elsewhere in these Contract Documents . <br /> 11 . WORK PROGRESS SCHEDULE <br /> The Work Progress Schedule shall be in the form of a bar graph (Gantt Chart) showing <br /> the time allotted for each of the various work activities and the cumulative project . The <br /> TS-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.