My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-018B
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-018B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 1:57:48 PM
Creation date
9/30/2015 7:16:51 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/20/2004
Control Number
2004-018B
Agenda Item Number
11.I.2
Entity Name
Applied Technology & Management
Subject
Contract Specifications
Mitigation Reef Design
Area
Ambersand Beach Sectors 1 & 2
Bid Number
6031
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3595
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY MITIGATION REEF PROJECT <br /> is TECHNICAL AND ENVIRONMENTAL SPECIFICATIONS <br /> 256 Accident Prevention Plan . The CONTRACTOR is required to submit to the <br /> COUNTY an Accident Prevention Plan ten ( 10 ) days after the Notice of Award and prior <br /> to the pre-construction meeting . The Accident Prevention Plan must be in accordance <br /> with all Federal safety standards as specified in EM 395- 1 - 1 , dated September 1996 , <br /> entitled " Safety and Health Requirements Manual . " Submission of the Plan does not <br /> constitute an endorsement on the part of the COUNTY or ENGINEER of the <br /> CONTRACTOR ' S Accident Prevention Plan . The Plan is intended to provide a method <br /> by which the CONTRACTOR demonstrates an awareness of Federal safety standards . <br /> 26 . SUPERINTENDENT <br /> The CONTRACTOR shall designate , in writing , to the COUNTY, qualified <br /> Superintendent(s ) to receive instructions from the COUNTY. The written designation of a <br /> Superintendent(s ) shall include all contact information necessary for the COUNTY to <br /> contact the Superintendent(s) 24 hours a day, including information regarding land-line <br /> phone numbers , cell phone numbers , pager numbers , e-mail addresses , and VHF radio <br /> call signs and working frequencies . Any and all instructions , advisements of non- <br /> compliance , or corrective actions relayed by the COUNTY, once received by the <br /> CONTRACTOR' S Superintendent(s) , shall be legally binding on the CONTRACTOR <br /> pursuant to the Contract Documents . At least one Superintendent of the CONTRACTOR <br /> shall be on-site and available to the COUNTY at all times during project construction . <br /> 27 . MISPLACED MATERIAL <br /> Should the CONTRACTOR, during the progress of the work, lose , dump , throw <br /> overboard , sink , or misplace any material or machinery, which in the opinion of the <br /> COUNTY should be removed , the CONTRACTOR shall recover and remove the same <br /> with utmost dispatch . The CONTRACTOR shall give immediate notice , with description <br /> and location of such obstructions , to the COUNTY. Should the COUNTY discover such <br /> obstruction , independent of the above provisions and notification requirements by the <br /> CONTRACTOR , the COUNTY shall mark or buoy the obstruction and notify the <br /> CONTRACTOR of its location . Removal of the obstruction shall be the responsibility of <br /> the CONTRACTOR and the cost of the removal shall be paid for by the CONTRACTOR <br /> at no additional cost to the COUNTY. Should the CONTRACTOR refuse , neglect, or <br /> delay compliance with the above requirements , such obstructions may be removed by <br /> the COUNTY and the cost of such removal shall be deducted from any payments due or <br /> to become due to the CONTRACTOR or may be recovered under the CONTRACTOR' S <br /> bond . <br /> 28 . PROTECTION OF WORK <br /> 28 . 1 Property Restoration , The CONTRACTOR shall support and protect all public and <br /> private property that may be encountered or endangered in the execution of the work <br /> herein contemplated , at its own cost and expense , at no additional cost to the COUNTY. <br /> The CONTRACTOR shall repair to its original condition and make good any damage <br /> caused to any such property by reason of the CONTRACTOR ' S or Subcontractor's <br /> TS -22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.