Laserfiche WebLink
Permittee : Indian River County Beach Restoration <br /> Permit No : 01669294014C <br /> Page 15 of 17 <br /> 0 <br /> accordance with the latest update of the BBWR Statewide Coastal Monitoring Program, Regional <br /> Data Collection and Processing Plan, Monitoring Plan Technical Specifications for Topographic <br /> and Bathymetric Surveying. <br /> b. Bathymetric surveys of the borrow area(s) shall be conducted within 90 days prior to <br /> commencement of construction, and within 60 days following completion of construction of the <br /> project concurrently with the beach and offshore surveys required above . Thereafter, monitoring <br /> surveys of the borrow areas shall be dependent on their location. Borrow sites located in tidal inlet <br /> shoals or in nearshore waters above the depth of closure for littoral transport processes shall be at <br /> two (2) year intervals concurrently with the beach and offshore surveys required above . These <br /> biennially monitoring surveys are not required for borrow sites located below the depth of closure <br /> for littoral transport processes . A prior design survey of the borrow area may be submitted for the <br /> pre-construction survey if consistent with the other requirements of this condition. <br /> Survey grid lines across the borrow area(s) shall be spaced to provide sufficient detail for accurate <br /> volumetric calculations but spaced not more than a maximum of 500 feet apart, and shall extend a <br /> minimum of 500 feet beyond the boundaries of the borrow site . For borrow sites located in tidal <br /> inlet shoals, bathymetric surveys of the entire shoal complex, including any attachment bars, shall <br /> be conducted unless otherwise specified by the Department based upon the size of the shoal and the <br /> potential effects of the dredging on inlet processes . In all other aspects, work activities and <br /> deliverables shall be consistent with the BBWR Statewide Coastal Monitoring Program, Regional <br /> Data Collection and Processing Plan, Monitoring Plan Technical Specifications for Bathymetric <br /> Surveying. <br /> c . Aerial photography of the beach shall be taken concurrently with the post-construction <br /> survey and each annual and biennial monitoring survey required above, as close to the date of the <br /> beach profile surveys as possible, and during approximate low water tide on that date. The limits of <br /> the photography shall include the surveyed monitoring area as described above. The photography <br /> shall be color vertical photos with a 30% forward overlap, taken from an elevation of 3 , 000 feet <br /> ( 1 : 6,000 negative scale) and centered on the local shoreline . A digital scan of the color photos at a <br /> rate of 21 microns with a pixel size of 0 .4 feet shall be made and submitted in TIF format <br /> (uncompressed) on CD or DVD . <br /> d. The permittee shall submit an engineering report and the monitoring data to the Office of <br /> Beaches and Coastal Systems within 90 days following completion of the post-construction survey <br /> and each annual or biennial monitoring survey. The survey data and control information should be <br /> submitted on electronic media such as floppy disk, or CD-ROM, in an ASCII format stored as <br /> specified in the Statewide Coastal Monitoring Program, Regional Data Collection and Processing <br /> Plan, Monitoring Plan Technical Specifications. <br /> The report shall summarize and discuss the data, the performance of the beach fill project, and <br /> identify erosion and accretion patterns within the monitored area. In addition, the report shall <br /> I <br /> nclude a comparative review of project performance to performance expectations and identification <br /> of adverse impacts attributable to the project. <br />