Laserfiche WebLink
"SECTION IV - TIME FOR COMPLETION" is being modified to incorporate the following <br />The time for completion of the 90% design drawings, permit applications, and Engineer's <br />Opinion of Probable Construction Cost for the project shall be three (3) months from the date of <br />execution of ADDENDUM No. 4. Once permits are received, 100% design drawings shall be <br />completed 30 days thereafter. <br />"SECTION V — COMPENSATION" is being modified to incorporate the following: <br />The COUNTY agrees to pay and the ENGINEER agrees to accept for services rendered <br />pursuant to this Agreement fees in accordance with the following: <br />A. Professional Services Fee <br />The basic compensation mutually agreed upon by the ENGINEER and the <br />COUNTY follows: <br />The following is a summary of costs: <br />Charge Associated with <br />Change in Project Scope <br />And Proiect Limits <br />GeotechnicalServices (Tierra)...................................................... $0.00 <br />Engineering (ARCADIS)....................................................... $169445.00 <br />Signal Plans(ARCADIS)....................................................... $16,720.00 <br />Design Survey (66"`Avenue) (ARCADIS)........................................$0.00 <br />Design Survey (Sidestreets)(ARCADIS).......................................... $0.00 <br />New Total <br />Compensation <br />$130,010.00 <br />$7779145.00 <br />$65,169.00 <br />$1699500.00 <br />$71,428.00 <br />Right -of -Way Survey and Map (6e Avenue) .................................. $0.00 $117,821.00 <br />Right-of-way Survey(Sidestreets).....................................................$0.00 $61,963.00 <br />Structural Design for 4 bridges <br />(Bridge Design Associates, Inc.) ....................................................... $0.00 $207,222.00 <br />Landscape& Irrigation.....................................................................$0.00 $37,000.00 <br />(Thomas Lucido & Associates) <br />PondSurveys .............................01.111.....................................................0.00 $20,000.00 <br />Page 3 of 5 <br />G:\LNR Support\ADMIN\Marketing\Proposals\WPB\2008\66 th Ave Amendment No 4- 2-12-08.doc <br />